Skip to the record
Every meeting, every word.

Council archive · source document

09/0928 - Operational Works - Detached House Driveway [As Published] · 142009.928

of 35

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED. PLANNING ACT 1997 - IDAS Assessment Checkiist, Version 22

 

 

 

   
 
 
 

[I No-Gotoo17 (1 Yes

  
 

is any part of the premises cE for community infrastructure?
Cre is the ona infrastructure intended to be provided by a public sector entity?

If yes, is hee ” ‘omned by or on behalf of the State?

Yes [JNo
Ino, is the development for the following?
(i) For the designated purpose [No [Yes
(ii) Camied out by, or on behalf of, the designator no [Yes

. ft No to either or both (i} or (ii) above, is the proposed development assessable under the planning scheme?

0 No oO Yes - This application must be referred to the Queensland Government department administering the Act authorising the
development for the designation as Concurrence Agency.
__}iP Region. schedue 2, table 3, tem 7. :

MANAGEMENT Ee epee cones

 

By

 

 

 

 

1 7 1 Does the proposal involve the establishment or expansion ofa waste water disposal system?

C1 No - end of Sections [] Yes
If yes, is any part of the dis pore system proposed to be located i in,an area declared to be a catchment-area under. the Water Act 2000?
No - End of Section 1
If yes, is the proposed waste water disposal sso an environmentally relevant activity (ERA) under the Environmental
Protection Act 1994?
(Yes - €nd of Section 1 ~[[} No

Ifo, is the proposed development involving the waste water disoosal system assessable under the planning scheme?

? oO No --End of Section 1 0 Yes = This pplication requires assessment by the Department of Néturat Resources and Water (NRW) as
: . Concirrence Agency End of Section 1

 

IP Regatation, schedule 2. taba 4 heen §

 

‘

Page 5 *

 
 

 

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0928 - Operational Works - Detached House Driveway [As Published].pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.