09/0928 - Operational Works - Detached House Driveway [As Published] · 142009.928
INTEGRATED PLANNING ACT 1997. : : IDAS Assessment Checklist, Version 22
- S$ ECTION 4 Section 4 must be completed when the application seeks approval to carry out operational work.
IPLANNING SCHEME - Z; Fee SBS Ee eee
4d ei proposed operational work assessable under any State planning regulatory provisions?
No :
- Ifo, is the proposed operational work assessable under the planning scheme?
DINo - Gotoas.2 Lives — Complete Form 1, Past E and answer Q4.1.1 - 4.1.7 below
(1 Yes
*— Ifyes, is the proposed operational work assessable under the planning scheme?
No — Answer Q4.1.1~4.1.7 Rl Yes — complete Form 1, Part E and answer 04.1.1-4.1.7 below
STATE-CONTROLLED ROAD...” day Bis Se aA
4.44 tt part of the premises located in part of a future State-controlled road, or within 100m of a State
No. oe ‘ .
If no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold? so :
CINo . [1 Yes.- This application must be refered to the Department of Main Roads (DMR) as Concurence Agency.
Yes .
If yes, is all of the proposed operational work associated with either -
« . Amiaterial change of use that is assessable under the planning scheme; or DNo Dyes
+ Reconfiguring a tot that increases the total number of lots, or increases the total number of lots
_ abutting the State-controlled road : .
red
é. SG
-controlled road? * ,
If no - Answer (a) - (0) below .
(a) _s any of the proposed operational work associated with access to a State-controlled road?
O No - Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) 1s any of the proposed operational work for filing or excavation? , 5
CINo 0 Yes
ifyes, is the operational work Proposed in a future State-controlled road not defined by route?
No - This epplication must be referred to the Department of Main Roads (DMR) es Concurrence Agency
oO Yes - This application must be referred to OMR as Advice Agency.
(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
aie a pipe chy a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
No Yes
Ifyes, is the operational work proposed in a future State-controlled road not defined by route?
C) No - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency.
(1 Yes - This apptcation must be referred to DMR as Advice Agency.
IP Requiation, schodi#e 2, laa 2, dem 3 1P Regilation schists 2 fable 3, ker 1(0)
AGID, ‘Soil SAGER ERE ON ae ; Be EEE
4.1.2. {Is any of the operational work proposed in a local government area listed‘ in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils? _ , : . .
PX] No-cotoasz3 [1 Yes .
~ _ Ifyes, is the natural ground level of any point where work is being carried out less than 20m AHD?
«<
No Yes
If yes, does the proposed operational work involve the following?
() Excavating more than 1,000m of soil or sediment at or below 5m AHD CiNo ClYes
{ii) Filling the premises with 1,000m? or more of material with an average depth of 0.5m on CINo (Yes
land, soil or sediment at or below 5m AHD
If yes to either or both (i) or (ii) above - This apptication must to be referred to the Department of Natural Resources and Water (NRW) as
iP Reguiation. schedule 2, tabie 3. 23m 4. Slete Pranning Pokey 277: Pancing aizt Managing Davexern 9 Avid Sutele Suis. section 26.
‘a Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Cabootture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
. Fitzroy, Gladstone, Gold Coasl, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Mornington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0928 - Operational Works - Detached House Driveway [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.