Original source · versioned page text
Arborist Report inc VMP
Very large file: it may take a few minutes
The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
VMP05a: Trees Retained and
Removed
175 Legend
163
Ï Site Proposed building
146 167
164
126 135 157 ÏÏ
Ï Cadastre Upper levels (L04 and
123 Ï
154
Ï Ï Ï 173
above)
111 118 139 162 ÏÏ165
! 136Ï 149
!
Lot boundary
114 131
Ground (L03)
Ï
103
Ï Ï ! 137Ï !
156! 174 !
!
! 155
127 Easement
Ï
141 142
! ! !
121
!
119 159 176! 172
Ï Ï
Below (L02)
!
86 88 91 129 140
!
102 109 113 125 152
Ï !!
117 170
153 Trees
! !!
89 ! 120
!
80
! !
128 143
Below (L01)
! !
ÏÏ 105 ! ! ! ! Ï Ï 147
! ! 148 150 161
104 124 ! !130 Retain
!Ï
81 Ï Ï !
! 115 ! Ï
Ï
134 177 !
!
106 !Ï 112
! 122
145
!!
!
Engineering
132 Ï
!
94 Remove
Ï ! ! !
108 107 116 133
Proposed services
Ï
97 169 171
84
!
82
Ï
110 Ï Tree protection zone
(TPZ) Existing services
!
! 98
! 99
76 87 92Ï
57 60 TPZ fence Earthworks
! ! !
72 96 !
62 74
Ï
Ground protection Sheet piling
Ï !
85 90
! !
! 59 Ï
100
58
Ï 95
Edge of batter
!
! 63 78 !
!
!
!
61 71
!
! 75 83
93
53 Ï 65 ! Ï
77
!
55 ! 64 101
73
!
! ! 56 This drawing has been prepared by, or compiled from information provided by,
49
!
67 69 persons other than Litoria Consulting, who retain copyright and liability
!68 !
Ï ! associated with their content:
!
48 52 66
!
! 54 ! ! 1. Nearmap 2022
70
!
50 !
2. Site Plan Level 2 Ground Entry Level (DBI Design, Drawing No. A-SD-1.102, Rev.
45! G, 05/07)
! 44 ! ! 2. Basement Masterplan with Existing Tree Overlay (DBI Design, Drawing No. L-
SD-201, 08/09)
! !
51
3. General Arrangement Plan (Richards and Spence, Drawing No. SD-A-01-01-
47 ! 46
G_LEVEL 01, Rev. Q, SD-A-01-02-G_LEVEL 02, Rev. O, SD-A-01-03-G_LEVEL 03,
Rev. P, SD-A-01-03-G_LEVEL 04, Rev. M, SD-A-01-03-G_LEVEL 05, Rev. L, SD-A-
41
01-03-G_LEVEL 06, Rev. L, 02/07/21)
43
57
4. Preliminary Earthworks Layout (Alta Projects, Drawing No. A6769-22-PEW01,
!
60
Rev. A, 08/22)
! 5. Preliminary Services Layout (Alta Projects, Drawing No. A6769-22-PD01,
Ï ! !
59
08/22)
! Litoria Consulting takes no responsibility for and makes no representations in
62
37 40 42
relation to the completeness, accuracy or quality of any information contained in
this drawing. Each user of this drawing releases Litoria Consulting from all and
Ï
29 31 35 ! any loss, damage, cost, expense or liability in relation to the use of, or any
! Ï 39 !
reliance on, this drawing or the information contained in it. Features on this plan
63 have been located to accuracy suitable for assessment and hence should not be
Ï Ï 34!
38
used for exact measurements. Areas and dimensions shown are indicative only
! and subject to final survey. Users should independently verify the accuracy,
!
fitness for purpose and application of information contained in these drawings.
58
23
! All written dimensions take precedence over scaled dimensions. The currency of
22 30 36 ! these drawings should be checked prior to use. This drawing is provided only
27
for the information of the person or organisation to which Litoria Consulting
!!
28!
Ï provides it. It may not be provided to, or used by, any other person without
Ï 33! Litoria Consulting's prior written consent. Do not scale drawing. should
32
! dimensions be conflicting or missing, notify litoria consulting and await further
15 ! instruction.
24 26
!
17
NOT FOR CONSTRUCTION Drawing Scale 1:500 @ A3
9 18 25
!
4 10 ! ! Drawn By FJ
7
!
20
!
! 12
!
! 21 Notes: Issue A
1 6 3
! ! 1. Where scaffolding is required within TPZ of trees, construction is to be in accordance with DWG Ref. 22011 VMP05a
8
!
Ï
! ! 16 19 VMP06a and VMP06b and supervised by the Project Arborist. Date Created 7/10/2022
Ï !!
2 5 ! 2. TPZ fencing is to be constructed between scaffolding and retained vegetation.
11 ! !
3. Ground protection and additional tree protection measures (i.e. tree and branch protection)
13 !14
are to be installed where required, in accordance with Figure 2 and supervised by the Project
!
! Arborist. Ground protection is to be installed following earthworks.
4. Vacuum excavation is to be used where required and supervised by the Project Arborist.
5. All works within TPZ of retained trees are to be supervised by the Project Arborist.
6. Refer to the Arborist Report (Litoria Consulting, October 2022) for detailed management
0 5 10 20 30 Metres
ABN: 75 100 511 689
procedures and tree protection measures.
[
lvl 3 22 wandoo st fortitude valley
po box 461 paddington qld 4064
p: +61 7 3852 4855 f: +61 7 3319 8953
e: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.