Original source · versioned page text
Arborist Report inc VMP
Very large file: it may take a few minutes
The original of this document is very large (12.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
VMP05b: Trees Retained and
Notes: Removed
1. Where scaffolding is required within TPZ of trees, construction is to be in accordance with VMP06a and VMP06b and supervised by
the Project Arborist. Legend
2. TPZ fencing is to be constructed between scaffolding and retained vegetation.
3. Ground protection and additional tree protection measures (i.e. tree and branch protection) are to be installed where required, in Site Proposed building
accordance with Figure 2 and supervised by the Project Arborist. Ground protection is to be installed following earthworks. Cadastre Upper levels (L04 and
4. Vacuum excavation is to be used where required and supervised by the Project Arborist. above)
Lot boundary
5. All works within TPZ of retained trees are to be supervised by the Project Arborist. Ground (L03)
6. Refer to the Arborist Report (Litoria Consulting, October 2022) for detailed management procedures and tree protection measures. Easement
Below (L02)
Trees
183 Below (L01)
Retain
181 193 197
!
151 188 Engineering
Remove
!
185
! !Ï ! Ï 204 Ï
Proposed services
Ï ÏÏ
196
195 Tree protection zone
Existing services
Ï
(TPZ)
TPZ fence Earthworks
Ground protection Sheet piling
79
Mulch stockpile Edge of batter
! (indicative only)
242
Ï 241
This drawing has been prepared by, or compiled from information provided by,
persons other than Litoria Consulting, who retain copyright and liability
associated with their content:
Ï
1. Nearmap 2022
2. Site Plan Level 2 Ground Entry Level (DBI Design, Drawing No. A-SD-1.102, Rev.
213 G, 05/07)
225
2. Basement Masterplan with Existing Tree Overlay (DBI Design, Drawing No. L-
! 228 SD-201, 08/09)
214 !215
3. General Arrangement Plan (Richards and Spence, Drawing No. SD-A-01-01-
! G_LEVEL 01, Rev. Q, SD-A-01-02-G_LEVEL 02, Rev. O, SD-A-01-03-G_LEVEL 03,
227
! Rev. P, SD-A-01-03-G_LEVEL 04, Rev. M, SD-A-01-03-G_LEVEL 05, Rev. L, SD-A-
226
!
230!
01-03-G_LEVEL 06, Rev. L, 02/07/21)
Ï !
216
4. Preliminary Earthworks Layout (Alta Projects, Drawing No. A6769-22-PEW01,
233 Rev. A, 08/22)
!232 5. Preliminary Services Layout (Alta Projects, Drawing No. A6769-22-PD01,
218! ! 08/22)
217
Ï
! ! 221
! 234
222 !
! 231
Litoria Consulting takes no responsibility for and makes no representations in
223 Ï
relation to the completeness, accuracy or quality of any information contained in
229
this drawing. Each user of this drawing releases Litoria Consulting from all and
Ï any loss, damage, cost, expense or liability in relation to the use of, or any
reliance on, this drawing or the information contained in it. Features on this plan
have been located to accuracy suitable for assessment and hence should not be
235
used for exact measurements. Areas and dimensions shown are indicative only
240
and subject to final survey. Users should independently verify the accuracy,
220 fitness for purpose and application of information contained in these drawings.
237!! !! 239
All written dimensions take precedence over scaled dimensions. The currency of
Ï these drawings should be checked prior to use. This drawing is provided only
! 224 !
236 238
for the information of the person or organisation to which Litoria Consulting
provides it. It may not be provided to, or used by, any other person without
212 219 Litoria Consulting's prior written consent. Do not scale drawing. should
Ï ! dimensions be conflicting or missing, notify litoria consulting and await further
200
instruction.
Ï
175 190 203
Ï Drawing Scale 1:500 @ A3
160 Ï 179 199 Ï 205
163 209
Ï
146
184 192
Drawn By FJ
158
164
!
126 135 ÏÏ
Ï 167Ï Ï
! !
138
Ï ! ! Issue A
123 157 180 !
!
Ï ! 207 ! 206
111 118 131 166 ÏÏ 165 ! 191 194 DWG Ref. 22011 VMP05b
! Ï136
162
!
114 Ï
Ï 139 ! Ï 144 187 208
103
! !
168! 174
Ï !
! 155
! Date Created 7/10/2022
Ï 121 127 129 ! Ï 149 178
! ! !
119 Ï
159 Ï 189 198 202
137 ! 173
! !
!
88 91 Ï 109
102 ! 125!
!!
143 152
113 117 140 141 153
!
172
!!
177 201! 210
80 ! 120
!
182 Ï 186
!
! !
89
!
128
!
Ï Ï 86
!
105 Ï 130 Ï 147 161 169
104 142 150
!Ï Ï !! ! Ï !
81
! ! Ï
124
! ! !
171 211
Ï ! ! !
115 122 134
106 ! 148
! !
Ï!112
!
145 !
!
132 Ï
!
Ï 94 ! !
108 107 116 133
84 97 !
Ï
82 110 Ï
0 5 10 ! 20 ! 30
99 Metres
! ABN: 75 100 511 689
[ 98 lvl 3 22 wandoo st fortitude valley
76 87 92Ï NOT FOR CONSTRUCTION
57 ! ! ! po box 461 paddington qld 4064
96 ! p: +61 7 3852 4855 f: +61 7 3319 8953
Ï Ï ! e: [email protected]
! !
Ï
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.