Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Delegated Report - Code - Planning MCU23 0015 [As Published]

of 12

Page text shows just the words. Original shows the document exactly as it was published.

                      b.      the dates when each person’s use, or occupation, of the premises for short stay letting
                              or home hosted accommodation began and ended.
               19.    The contact person, must make available, for inspection by Council, within 5 business days
                      of receipt of a written request given at any time, each of:
                           a. the written record of complaints referred to in condition 16; and
                           b. the register referred to in condition 18.
                      Water Supply
               20.    The development must be provided with a potable water supply. The storage capacity of the
                      potable water supply must be a minimum of 5,000 litres per guest.
                      Waste Water Treatment and Disposal
               21.    The development must be provided with an on-site waste water treatment and effluent
                      disposal system having a capacity sufficient for the use.
                      Bushfire Management
               22.    Access/Egress tracks must be maintained, be safe and available at all times to all of the
                      development for emergency vehicles and personnel.
               23.    The site must be provided with a water storage reservoir having a minimum 5,000 litres of
                      water for emergency firefighting purposes. Such storage must be provided in addition to the
                      water supply capacity required for the use and must be provided in the form of either an
                      accessible dam, swimming pool, or rainwater tank. If by rainwater tank, water storage for
                      firefighting purposes must be provided either in a separate rainwater tank or a reserve section
                      in the main water supply tank on which:
                      a.      the domestic take off from the tank is at or above the 5,000 litre point; and
                      b.      standard rural fire brigade fittings are fitted to the tank outlet for access by four wheel
                              drive rural services vehicles.
               24.    The site must be provided with an auxiliary power supply such as a petrol driven fire fighter
                      pump (or generator), together with a hose of sufficient length to easily reach around to all
                      sides of the building.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Infrastructure Charges
               25.    All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further information, please refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      Aboriginal Cultural Heritage Act 2003
               26.    There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                                                                                                         Page 10 of 12

Document Set ID: 22409500
Version: 8, Version Date: 14/07/2023
Log in to download the original file

Delegated Report - Code - Planning MCU23 0015 [As Published].pdf · 8.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.