Council archive · source document
Minor Change Existing Approval MCU22 0038 02 · MCU22/0038.02
4. ASSESSMENT MANAGER CONDITIONS
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and may
be further amended by the conditions of this approval.
Plan No. Rev. Plan/Document Name Date
0002 R Site Plan, prepared by Buchan 19.11.24
100-B1 N Basement 01, prepared by Buchan 05.11.24
100-B2 O Basement 02, prepared by Buchan 05.11.24
1000 U Ground Floor Plan, prepared by Buchan 19.11.24
1001 T Level 01, prepared by Buchan 19.11.24
1200 L Roof Plan, prepared by Buchan 19.11.24
A-DA-2000 Sections, prepared by Buchan 09.11.22
3000 N Elevations, prepared by Buchan 19.11.24
A-DA-6001 H Perspectives, prepared by Buchan 28.04.22
A-DA-6002 C Perspectives, prepared by Buchan 18.05.22
1.1 Site Plan, prepared by place design group 17.03.22
1.2 Landscape Elevations, prepared by place 17.03.22
design group
1.3 Perspective view, prepared by place design 17.03.22
group
2.1 Indicative plant palette – streetscape and 17.03.22
entry landscaping, prepared by place
design group
2.2 Indicative plant palette – bio basin 17.03.22
landscaping, prepared by place design
group
3.1 Indicative materials palette, prepared by 17.03.22
place design group
Nature and Extent of Approved Use
3. The approved use must not commence until all works required by RAL18/0023 have been
completed.
4. This approval is for a total of 2,170m2 of gross floor area, as depicted on the Approved Plans,
for the following uses:
a. Commercial Business Type 1 – Office
b. Commercial Business Type 2 – Medical
c. A radiation treatment facility (radiation bunker) - only to be operated in association with
a proposed oncology use (as detailed in the SLR Consulting Memo dated 3 February
2023 and Schematic of Staffing and Patient Levels prepared by SLR and dated
Page 2 of 15
Document Set ID: 23565068
Version: 5, Version Date: 21/02/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU22 0038 02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 323 KB (small file)
- File type
No other editions are linked here.