Minor Change Existing Approval MCU22 0038 02 · MCU22/0038.02

of 15

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                              17.02.2023). The oncology use and radiation treatment facility is to have a combined
                              gross floor area of 497m2 of the 2170m2 total approved floor area.
               5.     The approved uses and associated activities must not result in environmental nuisances
                      such as noise, visual or odour impacts that unreasonably diminish the amenity of the area or
                      surrounding uses.
                      Currency Period
               6.     This development approval lapses if the use has not happened by 18 August 2028, unless
                      an application to extend the currency period is approved by Council.
                      Built Form and Development Appearance
               7.     The maximum height of the development must be in accordance with the approved plans.
               8.     Certification must be submitted to Council from a Licensed Surveyor which certifies that the
                      buildings do not exceed the maximum height requirement of this Decision Notice.
               9.     All air conditioning units or other mechanical equipment must be fully enclosed or screened
                      such that they are not visible from the street frontages nor adjoining properties.
               10.    All deck and balcony areas above ground floor must not be enclosed by permanent fixtures
                      such as shutters, louvres, glass panelling or the like.
               11.    The development must incorporate the colour scheme and proposed mix of building
                      materials as outlined in the approved plans (Perspectives, prepared by Buchan dated
                      18.05.2022).
               12.    Any exterior façade where plain concrete is used must be painted or otherwise sealed to
                      prevent staining and mitigate against graffiti.
               13.    Any security screens on the premises consist of grille or translucent screens and not solid
                      shutters, screens or roller-doors.
               14.    All mechanical equipment and other service infrastructure located on the site must be:
                      a.      located not less than 2 metres from a property boundary;
                      b.      fully enclosed or screened such that they are not visible from the street frontages nor
                              adjoining properties. Where screened by landscaping, landscaping beds must be at
                              least 1.5 metres wide.
               15.    No part of the site may be used for outdoor storage of materials.
                      Performance Bond
               16.    Security in the form of a cash bond or trading bank guarantee to the sum of $25,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to pre-
                      start meeting. The cash bond or trading bank guarantee will be returned on performance of
                      the conditions of approval less any costs incurred by Council in respect of enforcing
                      performance of this permit. Council reserves the right to call upon the bond or guaranteed
                      sum to effect compliance with conditions.
                      Street Identification
               17.    The street address of the development must be clearly visible and discernible from the
                      primary frontage of the site by the provision of a street number and, where appropriate, the
                      building name.
                      Water & Sewer Connections
               18.    An underground connection to reticulated water and sewerage must be provided to the
                      development site in accordance with the standards and requirements of Northern SEQ
                      Distributor–Retailer Authority (Unitywater).
               19.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
                      must be submitted to Council that certifies an underground connection to reticulated water
                      and sewerage has been provided to the development site.


                                                                                                       Page 3 of 15
Document Set ID: 23565068
Version: 5, Version Date: 21/02/2025

Used in these records

About this file

File size
323 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval MCU22 0038 02.pdf · 323 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.