c. a total of 16 bicycle parking spaces; and
d. end of trip facilities involving 8 lockers, 2 male and female showers and change rooms
within the development.
Water Quality
57. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the latest version
of the Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland, and must include in particular:
a. stormwater quality treatment devices of a size and location generally in accordance
with those shown in Stormwater Management Plan, prepared by MPN Consulting,
dated 27th June 2022;
b. bioretention devices which:
i. demonstrate that Bio basin 1 is able to gravity drain to the existing stormwater
infrastructure on site. The outlet pipe grade must be a minimum of 0.5% to
ensure the bio basin is free draining.
i. are designed generally in accordance with the Bioretention Technical Design
Guidelines (Water by Design, 2012)
ii. are designed, where applicable, generally in accordance with IPWEQA Standard
Drawing No. DS-073, DS-075, DS-076, and DS-078
iii. are provided with a free-draining outlet from the sub-soil drainage system
58. A maintenance manual is required to be prepared for the stormwater quality treatment
devices, rainwater tanks and basement pump out system for the development. This manual
is to be submitted to Council at Operational Works stage for review.
59. Permanent educational signage must be erected to educate the residents of the development
about the function of the bioretention device(s). The dimensions, standard, presentation and
location of the educational signage must be in accordance with an Operational Works
approval.
60. All stormwater quality treatment devices must be maintained in accordance with the Water
by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The approved
Operational Works drawings for the stormwater quality treatment system and detailed life
cycle costing of the system must be attached as an addendum to this document. Records of
all maintenance activities undertaken must be kept and made available to Council upon
request.
61. Any proposed Community Management Statement required for the development must
include Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1) and
must include the full cost of maintaining the system in accordance with Water by Design
(2009) Maintaining Vegetated Stormwater Assets (Version 1). The cost of maintaining the
system must be included in the proposed levies for each unit owner.
Stormwater Drainage
62. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval and the Queensland Urban Drainage Manual, and must include in particular:
a. the detention system generally as described in Stormwater Management Plan,
prepared by MPN Consulting, dated 27th June 2022;
b. the use of gravity stormwater drainage and not surcharge pits to the maximum extent
practicable. Surcharge pits may only be used where the catchment is composed of roof
surfaces only;
c. provision of rainwater tanks for the capture and reuse of roof water for the irrigation of
communal landscaping; and
Page 7 of 15
Document Set ID: 23565068
Version: 5, Version Date: 21/02/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU22 0038 02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 323 KB (small file)
- File type
No other editions are linked here.