Minor Change Existing Approval MCU22 0038 02 · MCU22/0038.02
d. accommodation for both severe storms or severe blockage of the underground
drainage network. A Severe Storm/Severe Blockage Assessment for the drainage
system proposed for the site is to be provided with the development application for
operational works, and is to demonstrate that finished floor levels will not be inundated
under either a severe blockage of the underground drainage network in the 1%AEP
event at year 2100, or for a severe storm exceeding the 1%AEP based on design
blockage.
Acid Sulfate Soils
63. An Acid Sulfate Soil Management Plan must be prepared and submitted with the Operational
Works application for the site. The acid sulfate management plan must include testing,
monitoring and treatment requirements for the works.
Services
64. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
65. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
66. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
67. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
68. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
69. All excavation, fill, soil retaining structures and associated batters must be undertaken in
accordance with an Operational Works approval, and contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council.
70. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
71. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
WASTE DISPOSAL
72. Prior to the issue of any Operational Works approvals the Operational Waste Management
Plan must be amended to reflect that all waste collection will be undertaken by Council’s
contractor via rear lift trucks with the trucks collecting 1100 litre bins.
Page 8 of 15
Document Set ID: 23565068
Version: 5, Version Date: 21/02/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU22 0038 02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 323 KB (small file)
- File type
No other editions are linked here.