Development Application Part 3 of 3 - Plans · OPW11/0320
Plans and drawings: the text below has words only, no drawings.
Ln
SEDIMENT AND EROSION Ln
Co
CONTROL DETAILS En
FALL EROSION AND SEDIMENT IN ACCORDANCE WITH IN ACCORDANCE WITH
WITH MAROON BOOK MANUAL FOR EROSION AND SEDIMENT CONTROL
GEOTEXTILE STAKES
FILTER FABRIC- FTC STAKES
600mm (NOM) GAP
BETWEEN SAND BAGS GEOTDOILE
ACT AS SPILLWAY FILTER FABRIC
THREE LAYERS OF
SANDBAGS WITH ENDS
OVERLAPPED.
GEOTEXTILE INLET FILTER
DOWN STREAM GULLY PROTECTION DETAILS
NOT TO SCALE GEOTEXTILE INLET FILTER CONSTRUCTION NOTES
1. FABRICATE A SEDIMENT BARRIER FROM GEOTEXTA.E.
2. FOLLOW DETAIL FOR SEDIMENT FENCE FOR GEOFABRIC
INSTALLATION. REDUCE PICKET SPACINGS TO 1m CENTRES.
BURY THE TOP OF THE PLASTIC 3. DO NOT COVER THE INLET WITH CEOTEXRLE UNLESS THE
IN TRENCH MIN 300mm DEEP. DESIGN IS ADEOUATE TO ALLOW FOR ALL WATERS TO
STAPLE AT 150mm CENTRES. BYPASS IT.
COMPACT SOIL OVER BLANKET
OVERLAP-BURY UPPER END OF
LOWER BLANKET AS IN A. OVERLAP
END OF TOP BLANKET 300mm AND KERB INLET PIT SEDIMENT BARRIER
STAPLE AT 150 CRS.
FLOW
1.5m TIMBER STAKES
AT MAX 2.5m CENTRES
CENTRELINE SECTION AT POINTS -B- Unbound pavement material (gravel) to Grading
SEDIMENT FENCES
B, Table 9 of QT Specification MRS1 1.05,
exclude material finer than sieve 2.36mm Sediment Fence installed QC(oss th ontour
500mm TO - IwlcLxltaurDd concell oI of flaw sholIdCbe avoided
Runoff from pod directed to sediment trap 600mm 0
ON SOIL, 150mm a 100mm
TRENCH WITH COMPACTED a
BACKFILL AND ON ROCK, SET Cf
TEMPORARY CONSTRUCTION ENTRY/EXff SEDIMENT TRAP SECTION DETAIL INTO SURFACE CONCRETE
Not to scale
STAPLE BLANKETS SET 300mm ABOVE GROUND
AT GRID OF
1m CENTRES
SEDIMENT FENCE CONSTRUCTION NOTES
1. CONSTRUCTION SEDIMENT FENCES AS CLOSE AS
KERB INLET PIT SEDIMENT BARRIER POSSIBLE TO BEING PARALLEL TO THE CONTOURS OF THE
SITE. BUT WITH SMALL RETURNS. THE CATCHMENT AREA
CONSTRUCTION NOTES SHOULD BE SMALL ENOUGH TO OMIT WATER FLOW F
1. FABRICATE A SLEEVE FROM GEOTEXDLE OR WIRE MESH CONCENTRATED AT ONE POINT.
LONGER THAN THE LENGTH OF THE INLET PIT AND FILL 2. CUT A 150-mm DEEP TRENCH ALONG THE UPSLOPE
RUNOFF TO BE DIRECTED TO A SEDIMENT TRAP,
WITH 25mm TO 50mm GRAVEL LINE OF THE FENCE FOR THE BOTTOM OF THE FABRIC TO
REFER STANDARD DRAWING D-0041.
CLEAN/DIRTY DIVERSION DRAINS 2. FORM AN ELLIPTICAL CROSS-SECIRCUmON APPROX. 150mm BE ENTRENCHED.
HIGH, 400mm WIDE. 3. DRIVE TIMBER STAKES INTO GROUND AT 2.5m
TEMPORARY ENTRY/EXIT 3. PLACE THE FILTER AT OPENING LEAVING AT LEAST INTERVALS (MAX) AT THE DOWNSLOPE EDGE OF THE TRENCH.
100mm BETWEEN KERB INLET AND SLEEVE. MAINTAIN 4. FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE
OPENING WITH SPACER BLOCKS. SIDE OF THE P0515 ENSURING IT GOES TO THE BASE OF
DNERSION DRAIN CONSTRUCTION NOTES 4. FORM A SEAL WITH KERB TO PREVENT SEDIMENT THE TRENCH. FIX THE GEOTEXTILE WITH WIRE RECOMMENDED
TEMPORARY ENTRt'/EXIT CONSTRUCTION NOTES BYPASS. BY THE MANUFACTURER. THE USE OF SHADE CLOTH FOR
1. REMOVE ANY ROCKS. CLODS, STICKS OR GRASS FROM THE SURFACE BEFORE LAYING PLASTIC. THIS PURPOSE IS NOT SATISFACTORY.
2. ENSURE THAT TOPSOIL IS AT LEAST 75mm DEEP. 1. STRIP THE TOPSOIL, LEVEL THE SITE AND COMPACT THE SUBGRADE. 5. SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR
5. JOIN SECTIONS OF THE FABRIC AT A SUPPORT POST
3. ENSURE PLASTIC WILL BE CONTINUOUSLY IN CONTACT WITH TIE SOIL BY GRADING THE SURFACE 2. COVER THE AREA WITH NEEDLE-PUNCHED GEOTEXTILE. THE MESH OR GEOTEXTILE PROVIDED THEY ARE PLACED
WITH A 150mm OVERLAP.
CAREFULLY FIRST. 3. CONSTRUCTION A 200mm THICK PAD OVER THE GEOTEXTILE USING ROAD BASE OR 30mm. SO THAT THEY FIRMLY ABUT EACH OTHER AND 6. BACKFLL THE TRENCH OVER THE BASE OF THE FABRIC
4. LAY FABRIC IN 'SHINGLE FASHION'. WITH THE END OF EACH UPSTREAM ROLL OVERLAPPING THOSE 4. ENSURE THE STRUCTURE IS AT LEAST 15m LONG OR TO BUILDING ALIGNMENT AND AT SEDIMENT LADEN WATERS CANNOT PASS BETWEEN. AND COMPACT IT THOROUGHLY OVER THE GEO1EXTILE
DOWNSTREAM. ENSURE EACH ROLL IS ANCHORED PROPERLY AT ITS UPSLOPE END. LEAST 3m WIDE
5. ENSURE FULL WIDTH OF FLOW CHANNEL IS COVERED BY THE PLASTIC. 5. WHERE SEDIMENT FENCE JOINS ONTO THE STABILISED ACCESS, CONSTRUCTION A HUMP OR
GRATE IN THE STABILISED ACCESS TO DIVERT WATER TO THE SEDIMENT FENCE
U-
0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 3 of 3 - PlansRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.