CONSTRUCTION MANAGEMENT PLAN I
Performance
Indicators
Item Performance Indicator
CONSTRUCTION MANAGEMENT PLAN DIARY
1. Vegetation No disturbance of soil below retained vegetation due to construction activities. Weekly Visual hspe(tion or After Rainfall Event
Project:- Operational Works - Sewer Re-Alignment
2. Hours of Work
No work conducted outside specified hours without satisfactory evidence of measures Principal:-
taken to suppress noise and other emissions / dust. Contractor:- S TOOHEY
Location:- 17 TOPAZ STREET. COOROY
3. Lighting No resident's complaints regarding construction security lighting. Job Ref. No:- 110586 Council File Ref. No.
No abutting public roads contain soil, gravel, clay or other such materials originating
Date:- Li Regular Monitoring (Weekly)
4. Existing Roads
from onsite construction activities. Apwox Tie- am/pen q Special Event Noi tong (briefly describe event)
No observed o- reported incidents due to inadequacy or absence of signage or other Condition Corrective Action
5. Signage Date Control Corrective Action Token
Contra 7n _s_ C:. Item Monitored Acceptable
Measure Installed Required
(Describe)
x
6. Waste Control No complaints from local residents and site is kept tidy at all time
Retained Vegetation
No occurrence of illegal dumping onsite and all materials where possible have been
7. Waste Minimisation
appropriately recycled.
Air Emissions
B. Dangerous Goods No spillage or seepage of dangerous goods stored onsite.
Noise
9. Erosion & Sedimentation No visible signs of sediment laden waters leaving the site.
Security Lighting
No works are carried out without implementation of the approved Traffic Management
10. Traffic Management
Plan. Vibrations
11. Existing Infrastructure Existing Utilities, Roads & Drainage Infrastructure
No unplanned damage to existing utilities and infrastructure.
Construction Traffic & Parking
12, Non Conformances All non conformances have been reported and rectified
The site foreman is to monitor the performance of all construction activities and any departure from the Construction Waste Minimisation I Recycling
Monitoring Management Plan control measures is to be immediately rectified.
Erosion & Sedimentation Control (Environmental Diary)
The site foreman is to be responsible for all inspections and maintenance of the Construction Management Plan.
Other
Responsible Pe h son
The site foreman is to complete the Construction Management Plan Diary )including Environmental Diary for sediment
Item Monitored
control) on a weekly basis as a minimum, but also after every significant rainfall event (which causes site runoff) or
other special event affecting the site or any watercourses traversing the site. The Construction Management Plan Diary
(in conjunction with the Environmental Diary) shall be completed and delivered to the Superintendent for record and audit
Reporting Any Special Caren
purposes with each progress claim for the construction works.
The site foreman is to arrange all corrective actions, controls and rectification activities, and report on all measures
Corrective Acti nstaken in the Construction Management Plan Diary.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 3 of 3 - PlansRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.