IDASform20_DaintreeEstate · OPW14/0369
Attached to the e-mail OPW14/0369 Operational Works Application Flood Mitigation - Stage 2 - Retaining Wall - Daintree.
IDAS form 20—Interfering with overland flow water and
construction or modification of a levee
(Sustainable Planning Act 2009 version 4.1 effective 1 October 2014)
This form must be used for development applications for operational work that involves:
Interfering with overland flow water; or
Construction or modification of a levee.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications you must:
complete IDAS form 1—Application details
complete any other forms relevant to your application
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
Planning Regulation 2009.
Note: If this development application involves a state resource, this application is not required to be supported by
evidence of resource entitlement. The allocation or entitlement to the resource is a separate process and should be
obtained prior to development commencing.
This form can also be completed online using MyDAS at www.dsdip.qld.gov.au/MyDAS
Mandatory requirements
1. Are the works existing?
No Yes—date constructed (if known)
2. What is the nature of the proposed work? (Tick all applicable boxes.)
Levee or levee bank Storage
Drainage works Other—specify below
Embankment
3. What is the purpose of the proposed work? (Tick all applicable boxes.)
Flood mitigation
Drain land
Alteration, repair or extension of existing works
Related to water supply
Related to residential development
Related to commercial, industrial or agricultural development
Storage for watercourse water
Non-mandatory requirements
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
Integrated Development Assessment System form
4. What are the details of the proposed construction materials (e.g. rock, earth, concrete)?
Earth, rock, concrete
5. What are the details of the proposed construction method?
Core filled concrete block retaining wall
Mandatory supporting information
6. Confirm that the following mandatory supporting information accompanies this application
Mandatory supporting information Confirmation of Method of
lodgement lodgement
A sketch plan showing:
the location of the proposed works and any existing works for levees or Confirmed Email
interfering with overland flow water
lot boundaries and descriptions Confirmed Email
existing works Confirmed Email
Not applicable
the position of any watercourses or water bodies Confirmed Email
Not applicable
the position of any roads Confirmed Email
Not applicable
the position of any area to be irrigated. Confirmed
Not applicable
Written documentation
Hydrology report assessing the potential impact of the proposed works on any Confirmed
adjacent watercourse or water body and surrounding floodplain.
Not applicable
A statement addressing the relevant part(s) of the State Development Confirmed
Assessment Provisions (SDAP). Not applicable
For an application involving assessable development for the construction or modification of a levee
A hydraulic assessment including modelling to determine what changes in Confirmed Email
water level, velocity and flow direction will occur as a result of constructing
or modifying the levee. Not applicable
A design report that outlines the description of the site, the nature and Confirmed Email
extent of the works to be constructed or modified, construction
considerations and operation and maintenance considerations. Not applicable
Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the
use of information recorded in this form.
OFFICE USE ONLY
Date received Reference numbers
IDAS form 20—Interfering with overland flow water and construction or modification of a levee or levee bank
Version 4.1—1 October 2014
Page 3
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Qld 4002
tel 13 QGOV (13 74 68)
[email protected]
www.dsdip.qld.gov.au
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Qld 4002
tel 13 QGOV (13 74 68) IDAS form 20—Interfering with overland flow water and construction or modification of a levee or levee bank
[email protected]
Version 4.1—1 October 2014
www.dsdip.qld.gov.au