Council archive · source document
OPW14/0369 Operational Works Application Flood Mitigation - Stage 2 - Retaining Wall - Daintree
Subject: Stage 2 levee banks Daintree 1 of 3 From: Allister Haynes Date: 2014-12-01T04:10:51+00:00 To: Mailbox Council Mail Mark, We enclose letter and forms for Operational Works Application of Stage 2 works. Adam Britton will arrange payment of the fee as follows; · $2,409.00 As the Stage 1 Application under Section 34 included stage 2, it was not included. Regards, Allister Haynes BE Civil(Hons), RPEQ, CPEng, MIEAust Callaghan and Toth Civil, Environmental and Hydraulic Engineers 8/41 Sunshine Beach Road, Noosa Heads Phone 07 54749081 Email [email protected]<mailto:[email protected]>
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW14/0369 Operational Works Application Flood Mitigation - Stage 2 - Retaining Wall - DaintreeRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
- MSG
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.