Council archive · source document
IDASform20_DaintreeEstate · OPW14/0369
Attached to the e-mail OPW14/0369 Operational Works Application Flood Mitigation - Stage 2 - Retaining Wall - Daintree.
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Qld 4002
tel 13 QGOV (13 74 68)
[email protected]
www.dsdip.qld.gov.au
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Qld 4002
tel 13 QGOV (13 74 68) IDAS form 20—Interfering with overland flow water and construction or modification of a levee or levee bank
[email protected]
Version 4.1—1 October 2014
www.dsdip.qld.gov.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
IDASform20_DaintreeEstate.pdfRelated documentApplication case desk ↗
About this file
- File size
- 146 KB (small file)
- File type
No other editions are linked here.