GENERAL COMMITTEE MEETING MINUTES 12 OCTOBER 2020
6 51901.3614.01, 51901.3786.02, 51992.479.01, 51994.1249.01, 51994.1048.01 &
MCU13/0081.01 – MINOR CHANGE TO MULTIPLE DEVELOPMENT APPROVALS
FOR 47 MULTIPLE DWELLINGS, ENTERTAINMENT & DINING - TYPE 1 FOOD &
BEVERAGE AND RETAIL BUSINESS - TYPE 1 LOCAL AND TYPE 2 SHOP &
SALON – 71 HASTINGS STREET, NOOSA HEADS
The following material was presented to the meeting in relation to this item:
Cr Stockwell – refer to Attachment 3
Motion
Moved: Cr Stewart
Seconded: Cr Wegener
That Council note the report by the Development Planner to the General Committee
Meeting dated 12 October 2020 regarding Application No. 51901.3614.01,
51901.3786.02, 51992.479.01, 51994.1249.01, 51994.1048.01 & MCU13/0081.01 to
make a minor change to existing approvals for a mixed use development commonly
known as Netanya and situated at 71 Hastings Street, Noosa Heads and:
A. Approve the change.
B. Include the following additional conditions on 51901.3614.01, 51901.3786.02,
51992.479.01, 51994.1249.01, 51994.1048.01 and MCU13/0081.01:
Additional conditions – 15 October 2020
Approved Plans
1. Development authorised by this approval must be undertaken generally in
accordance with the Approved Plans. The approved plans are listed in the
following table and may be amended by these conditions and annotations
on the plans.
Plan No. Rev Plan Name – Prepared by Date
19021 E Cover Sheet, prepared by Sprout Architects 5/08/2020
SD00.00
19021 E Locality & Register, prepared by Sprout 5/08/2020
SD00.01 Architects
19021 E New Works - First Floor Site Plan, prepared 5/08/2020
SD10.01 by Sprout Architects
19021 E New Works - Second Floor Site Plan, 5/08/2020
SD10.02 prepared by Sprout Architects
19021 E New Works - Third Floor Site Plan, prepared 5/08/2020
SD10.03 by Sprout Architects
19021 E New Works – Fourth Floor Site Plan, 5/08/2020
SD10.04 prepared by Sprout Architects
19021 I New Works – Ground Floor, prepared by 6/10/2020
SD20.00 Sprout Architects
19021 E New Works – First Floor, prepared by Sprout 5/08/2020
SD20.01 Architects
19021 E New Works – Second Floor, prepared by 5/08/2020
SD20.02 Sprout Architects
19021 E New Works – Third Floor, prepared by 5/08/2020
SD20.03 Sprout Architects
Page 11 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.