PROJECT URBAN – 21172 25 Feb 2022 INFRASTRUCTURE The subject site is currently connected to all essential urban infrastructure. Stormwater will be collected and treated on site and discharged into a legal point of discharge in accordance with the attached Stormwater Management Report prepared by Westera Partners. Internal water, sewer, telecommunication and electrical connections will be finalised during detail design. DEVELOPMENT ASSESSMENT REPORT Page 9 of 18 Material Change of Use – Multiple Dwelling 4 Ventura Street, Sunrise Beach QLD 4567