Skip to the record
Accept no imitations.

Original source · versioned page text

Development Assessment Report

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

PROJECT URBAN – 21172                                                                   25 Feb 2022




INFRASTRUCTURE

The subject site is currently connected to all essential urban infrastructure. Stormwater will be
collected and treated on site and discharged into a legal point of discharge in accordance with
the attached Stormwater Management Report prepared by Westera Partners. Internal water,
sewer, telecommunication and electrical connections will be finalised during detail design.




DEVELOPMENT ASSESSMENT REPORT                                                           Page 9 of 18
Material Change of Use – Multiple Dwelling
4 Ventura Street, Sunrise Beach QLD 4567
Log in to download the original file

Development Assessment Report.pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.