28. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in particular:
a. A two metre wide concrete footpath within the road verge for the entire length of the
site’s frontage to Gateway Drive and connecting to the existing path fronting Lot 11
SP170295.
b. Pedestrian pathways between the proposed car parking area and the building/s.
c. Adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels.
d. Signage and lighting at strategic locations to direct people to building entries and public
toilet facilities.
e. Pedestrian refuge areas at strategic locations within the carpark to ensure safe and
convenient congregating of pedestrians waiting to cross major access driveways.
f. A total of 2 bicycle parking spaces
g. End of trip facilities involving 2 lockers, male and female showers and change rooms.
Condition 28a is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
STORMWATER DRAINAGE
29. Carry out the development to ensure that adjoining properties, reserves and roads are
protected from ponding or nuisance from stormwater as a result of any works undertaken.
30. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval, AS3500.3 and the Queensland Urban Drainage Manual, and must include in
particular:
a. Underground detention tanks and drainage works generally as shown in Appendix C
of the Site Based Stormwater Management Plan Rev 07, prepared by ACOR
Consultants, dated 24/08/2023
b. Collection and discharge of stormwater to Council’s underground pipe network in
Gateway Drive
c. Extension of the site stormwater system to accommodate stormwater from the external
catchment East of the site, including registration of drainage easements over the pipe
network within the subject site in favour of the upstream lot.
d. Cut off drains along the Eastern site boundary to convey external catchment flows up
to the 1%AEP climate change event into the pipe network within the site
e. The use of gravity stormwater drainage and not surcharge pits.
Condition 30 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
STORMWATER QUALITY MANAGEMENT
31. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the Bioretention
Technical Design Guidelines (Water by Design, 2014), and must include in particular:
a. Stormwater quality treatment devices of a size and location generally in accordance
with those shown in Appendix C of the Site Based Stormwater Management Plan Rev
07, prepared by ACOR Consultants, dated 24/08/2023
b. A minimum 5kL rainwater harvesting tank, plumbed to supply toilet flushing and
landscape irrigation
Page 6 of 10
Document Set ID: 23023774
Version: 5, Version Date: 22/05/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original