Council archive · source document
Development Application part 2 of 2 Report and Plans MCU13/0030
Plans and drawings: the text below has words only, no drawings.
Very large file (71.1 MB): may take a few minutes to open.
Specific Outcomes Probable solutions Proposal
for occupants every day use and fire b) Where more than 3 bedrooms -
fighting purposes. 60,000 litres;
AND
c) There is to be on the lot a dam,
swimming pool or water tank accessible
for use by the fire brigade that contains
at least 5,000 litres of water.
Advisory note
The 5,000 litres required can be
included within the water required in
54.2 or 55.1 providing it is accessible for
the purpose of fire fighting at all times
and not used for other domestic
purposes.
Erosion and sediment control No solution provided. Complies
06 Development does not cause Development will not cause erosion or
erosion or result in transport of Advisory Note result in the transport of sediments off-
sediments off-site. Persons undertaking development, site. Refer to the Integrated
including building work, are required 5tormwater Management Plan included
under the Environmental Protection as Attachment C. An erosion and
(Water)Policy 1997 (EPP)to ensure that sediment control plan will be provided as
sediment and other material induding part of a subsequent operational works
building waste, sawdust, concrete, application.
cement or paint are not deposited or
released into a roadside gutter,
stormwater drain or waterway, or into a
pla where it could reasonably be
expected to move or be washed into a
roadside gutter, stormwater drain or
waterway and are not washed from the
site. Council enforces the EPP and
penalties may apply.
Safety and security S7.1 The building entrance is clearly Complies
07For Multiple Housing Types 2, 3 identifiable and visible from the street, The proposal provides clear, identifiable
and 4, buildings and outdoor spaces are footpath and driveway; and visible entrances from the street,
designed to protect the personal security AND footpath and driveway.
and safety of residents by allowing for
natural surveillance. S7.2 The internal path network has Complies Specific Outcome
-
clear sightlines to the dwelling entry and Pathways are provided throughout the
street access points; site and grounds for recreational
purposes and as such are not always
AND visible from entry points. The entire path
network is visible from the facility and is
considered safe.
S7.3 Visitors have direct access to the Complies
entrance without passing through Direct visitor access to the front door of
private outdoor living areas. each building in the facility is provided.
Emergency access No solution provided. Complies
08For Multiple housing Type 3, 4 & Emergency vehicles are able to easily
5, site design and layout ensures access the site. A new vehicle crossover
efficient access and egress for is proposed which will ensure easy
emergency vehicles. access to the additional building areas.
Basement drainage S9.1 Enclosed car parking and Not Applicable
09 Buildings and access works are manoeuvring areas are constructed at a No basement proposed.
designed and sited to protect persons level that permits the parking area to
and property in the event of a flood and drain from the site by gravity means,
power failure. without the need for mechanical
pumping.
Separation ofincompatible uses S10.1 Bedroom windows are at least Complies
010 Development is designed to 3m away from shared
driveways or All bedroom windows achieve a
minimlse noise carrying between carparking areas of adjacent dwelling minimum 3m distance facing away from
dwelling units or accommodation units units or accommodation units. driveways/ car parking areas and
by locating noise sensitive spaces such adjacent dwelling units.
as bedrooms away from noise
generating areas of the development,
such as carparking areas or mechanic
plant and equipment or recreational
facilities.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 Report and Plans MCU13/0030Related documentApplication case desk ↗
About this file
- File size
- 71.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.