Council archive · source document
Development Application part 2 of 2 Report and Plans MCU13/0030
Plans and drawings: the text below has words only, no drawings.
Very large file (71.1 MB): may take a few minutes to open.
PRE DEVELOPMENT Cooroy Aged ca noosa 10-Year Ouration=6 min, Inten=20B.9 mm/hr
Prepared by {enter your company name here} Printed 17/02/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC
TIme span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method -
Pond routing by Stor-Ind method
Subcatchment 2S: Grass carpark area Runoff Area=957.0 m2 0.00% Impervious Runoff Depth=12 mm
Tc=10.0 min C=0.70 Runoff=0.02336 m3/s 0.011 MI
Subcatchment 5S: Existing roof Runoff Area=2,806.0 m2 100.00% Impervious Runoff Depth=28 mm
Tc=6.0 min C=1.00 Runoff=0.16306 m3/s 0.079 MI
Subcatchment 6S: grass for new roof Runoff Area=768.0 m2 0.00% Impervious Runoff Depth=12 mm
Tc=10.0 min C=0.70 Runoff=0.01874 m3/s 0.009 MI
Reach 4R: (new Reach) Inflow=0.20516 m3/s 0.100 MI
Outflow=0.20516 m3/s 0.100 MI
Total Runoff Area = 0.4531 ha Runoff Volume = 0.100 MI Average Runoff Depth 22 mm=
38.07% Pervious = 0.1725 ha 61.93% Impervious 0.2806 ha
=
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 Report and Plans MCU13/0030Related documentApplication case desk ↗
About this file
- File size
- 71.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.