Council archive · source document
Development Application part 2 of 2 Report and Plans MCU13/0030
Plans and drawings: the text below has words only, no drawings.
Very large file (71.1 MB): may take a few minutes to open.
PRE DEVELOPMENT Cooroy Aged c noosa 100-Year Ouration=6 min, Inten=301.0 mm/hr
Prepared by {enter your company name here} Printed 17/02/2013
[email protected] sIn 05328 @ 2011 HydroCAD Software Solutions LLC
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method -
Pond routing by Stor-Ind method
5ubcatchment 25: Grass carpark area Runoff Area=957.0 m2 0.00% Impervious Runoff Depth=20 mm
Tc=10.0 min C=0.84 Runoff=0.04039 m3/s 0.020 MI
Subcatchment 55: Existing roof Runoff Area=2,806.0 m2 100.00% Impervious Runoff Depth=41 mm
Tc=6.0 min C=1.00 Runoff=0.23494 m3/s 0.114 MI
5ubcatchment 65: grass for new roof Runoff Area=768.0 m2 0.00% Impervious Runoff Depth=20 mm
Tc=10.0 min C=0.84 Runoff=0.03241 m3/s 0.016 MI
Reach 4R: (new Reach) Inflow=0.30774 m3/s 0.149 MI
Outflow=0.30774 m3/s 0.149 MI
Total Runoff Area = 0.4531 ha Runoff Volume = 0.149 MI Average Runoff Depth 33 mm=
38.07% Pervious = 0.1725 ha 61.93% Impervious 0.2806 ha
=
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 Report and Plans MCU13/0030Related documentApplication case desk ↗
About this file
- File size
- 71.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.