Approved Plan - EXE21-0015

of 21

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                        -
                                                                                                                 APPROVED PLAN
                                                                                                                   EXE21/0015
                                                                                                                 NOOSA COUNCIL
                                                                                                                  19 JUNE 2021
                                                                                                                        -




28 May 2021                                                                                     Project No. 21182-001-Rev0

Mr Dean Frith

Email: [email protected]



SLOPE STABILITY ASSESSMENT
PROPOSED SHED
210 LAWNVILLE RD, BLACK MOUNTAIN


Dear Dean,

1.0     INTRODUCTION
Tectonic has undertaken a slope stability assessment for a proposed shed at 210 Lawnville Rd, Black
Mountain. This report presents the results of our slope stability assessment, together with geotechnical
advice for the development. In summary, subject to implementation of the recommendations made herein,
it is assessed that there would be a Low Risk of slope instability affecting the proposed shed in accordance
with the Australian Geomechanics Society Guidelines for Landslide Risk Management, dated March 2007
(AGS 2007).

1.1    Details of Site and Development

The subject site is described as Lot 22 on SP236310 and covers a total area of 16,879 m2. The site is
accessed via a bitumen driveway from Lawnville Road to the south. The surrounds feature similar rural
residential blocks. Text Figure 1 below illustrates the site position. A detailed description of the site features
is given in Section 2.




                      Approx. site of proposed shed


                                                                              Lot boundary




Text Figure 1: 2019 Aerial Image of site and surrounds (courtesy Noosa Council [NC] Interactive Maps)




                                                      Tectonic Geotechnical Pty Ltd
                                                     PO Box 899, Buderim, QLD 4556
                                         Office: 07 5478 9016 Email: [email protected]
                                                         www.tectonicgeo.com.au
                                                           A.B.N. 83 165 727 828
Log in to download the original file

Approved Plan - EXE21-0015.pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 20 pages

Page 2

Mr Dean Frith                                                                                    21182-001-Rev0
                                                                                                    28 May 2021

The existing building platform has been formed by cut and fill earthworks. It is estimated that fill in this area
ranged up to 1.5 m high, with cuts up to 1 m depth. Design drawings by Best Sheds (ref. Job No.
1713555893, Sheets 1 to 8, dated 8 February 2021) detail the shed will have a plan area of 12 m by 7.5 m
and will comprise a concrete slab on ground floor with steel framing and sheet metal cladding to the walls
and roof. The shed is proposed to be located approximately 1 m off the cut face and ranges approximately
1 m to 5 m off the crest of the fill batter.




                            Approx. site of proposed shed     Gravel access driveway




             Bitumen driveway




Text Figure 2: Approximate site layout of proposed shed (courtesy of nearmap, 2021)


1.2    Method and Scope of Investigation
As part of our slope stability assessment, a desk-top study was carried out comprising a review of
published geological maps, aerial photos, and a ‘soil test’ report prepared by Ground Drill (Ref. 21/213,
dated 27 April 2021).

A walk-over survey was conducted in order to make an appraisal of the general condition of the site in
regard to topography, drainage, vegetation cover, geology, erosion and slope stability and existing
structures. The walk-over survey was carried out by an experienced geotechnical engineer from Tectonic
on 14 May 2021.
The results of the desk-top study and walk-over survey are included in Section 2 below.

1.3    Qualifications of Responsible Engineer
This report has been reviewed by Mr Ashley Davey, an RPEQ with more than 25 years’ experience in
geotechnical engineering, including a number of slope stability projects.




                                                            2/14

Page 3

Mr Dean Frith                                                                                                21182-001-Rev0
                                                                                                                28 May 2021

2.0      DESCRIPTION OF EXISTING CONDITIONS
2.1    Geology and Subsurface Conditions
The 1:100,000 scale Gympie Special Geological Map1 (Ref. Text Figure 2 below) indicates that the site is
underlain by early to middle Triassic age meta-sedimentary geology (‘arenite, argillite, phyllite’) of the Kin
Kin Beds (pale green blue shading).




                                                                                   Approx. site location




Text Figure 2: Extract of Gympie Special Geology Map

Along the southern cut batter for the proposed shed pad, exposures of distinctly weathered, low strength
phyllite were observed (Ref. Text Figure 3).




Text Figure 3: Phyllite exposed in cutting along access track

The Ground Drill investigation comprised two boreholes across the proposed building platform to depths
of 0.5 m to 2 m below ground level (BGL). Borehole BH1, closest to the cut batter, encountered distinctly
weathered, low strength rock with auger refusal at 0.5 m BGL. Borehole BH2, closest to the fill batter,




1
 State of Queensland, Department of Mines and Energy, Gmypie Special 1:100,000 Geological Series, Sheet 9445 and Part 9545, First
Edition 1999




                                                               3/14

Page 4

Mr Dean Frith                                                                                    21182-001-Rev0
                                                                                                    28 May 2021

encountered 1.3 m of firm gravelly silty clay, then natural stiff silty clay to 1.8 m BGL, underlain by
distinctly weathered, low strength rock to borehole termination at 2 m BGL.

Ground Drill has classified the site as Class P in accordance with AS2870, due to the presence of
existing uncontrolled fill and poor bearing capacity; however has stated that if not for the above, the site
would have the characteristics of Class H1.
No groundwater was mentioned in the Ground Drill borehole reports, with the clay soils described as
‘moist’.

We have not sighted any documentation regarding the existing fill, and it is therefore classified as
‘uncontrolled’ in accordance with the definitions given in AS 2870-2011 Residential Slabs and Footings.

2.2   Topography
As illustrated in Text Figure 4, the property is located just down slope (north) from a gently sloping hilltop.
Inferred natural gradients measured using a hand-held clinometer above and below the proposed shed site
ranged between about 15° and 20° with more gentle slopes (10° to 12°) noted to the north of the
development area.

Previous earthworks had been undertaken for the gravel access driveway to the proposed shed and for the
building platform. Cut batters for the gravel access driveway dipped at 26°, whilst cut batters in distinctly
weathered, low strength rock dipped at 60°. The fill embankment was battered at about 35° exposing site
won clays and rock/gravel fragments.

A slump was observed within the fill batter with tension cracks also noted further west of this location. The
slump was measured to be about 1 m off the corner peg of the shed.




                  Approx. Shed location




Text Figure 4: Image showing ground surface contours (courtesy NC Interactive Maps)



Text Figures 5 to 9 overleaf illustrate the site conditions at the time of our inspection.




                                                        4/14

Page 5

Mr Dean Frith                                                                    21182-001-Rev0
                                                                                    28 May 2021




Text Figure 5: Small cut pad above proposed shed location




Text Figure 6: Easterly view across access driveway and proposed shed location




                                                            5/14

Page 6

Mr Dean Frith                                                                                          21182-001-Rev0
                                                                                                          28 May 2021




Text Figure 7: Approximate shed location (pegged out)




                                               Slump
                                                                           Corner peg



                    Rill erosion




                                                                  Tension cracking




Text Figure 7: Looking west over slump, tension cracking and rill erosion within the fill embankment




                                                           6/14

Page 7

Mr Dean Frith                                                                                          21182-001-Rev0
                                                                                                          28 May 2021




Text Figure 9: Looking east over slump, tension cracking and rill erosion within the fill embankment

2.3    Groundwater
No seepage or ‘springs’ were observed in the vicinity of the proposed development area. No groundwater
was encountered in the Ground Drill boreholes with the soils being described as mostly ‘moist’.
Groundwater conditions may vary seasonally, and groundwater seepage could develop, particularly
following periods of prolonged or heavy rainfall.

2.4    Surface Drainage
Broadly, natural surface drainage follows the ground surface contours to the north and north-east. A small
pond was located to the north, well downslope of the proposed shed location. A spoon drain was installed
between the cut batter and the access driveway upslope of the proposed building platform, which diverts
upslope stormwater towards the west into a grated inlet, then under the driveway, discharging onto the fill
embankment (Ref. Text Figure 10). Erosion of the fill embankment was observed at this location.




Text Figure 10: Spoon drain upslope of building platform (LHS) and discharge point onto fill embankment (RHS)




                                                            7/14

Page 8

Mr Dean Frith                                                                               21182-001-Rev0
                                                                                               28 May 2021

Surface water is expected to drain well from the site considering the moderate natural gradients and low
permeability of the clay soils in the immediate subsurface, and relatively shallow depth to rockhead.

2.5    Vegetation
The immediate area of the proposed shed consisted of bare ground with exposed soils, some of which had
been covered by gravel. Medium to large size mature trees were noted on the sloping ground to the north
and south around the proposed shed, which were observed to be relatively ‘plumb’. Tree root bases were
observed within the fill embankment which had not been ‘grubbed out’ (ref. Text Figure 11). These showed
evidence of soil erosion around the root base.




Text Figure 11: Root base at crest of the fill embankment

2.6    Buildings and Other Structures
No structures were present on site at the time of our assessment. The existing driveway pavement displayed
longitudinal cracking along the edges, however this did not appear to have been caused by slope instability.




Text Figure 12: Longitudinal cracking within driveway




                                                            8/14

Page 9

Mr Dean Frith                                                                                           21182-001-Rev0
                                                                                                           28 May 2021

3.0     ASSESSMENT OF LAND STABILITY
3.1   Existing Conditions
The proposed shed site has generally been mapped by NC as presenting a Moderate landslide hazard area
(pale yellow brown shading). An extract of the NC mapping is given below in Text Figure 13.




                                              Proposed shed site




Text Figure 13: Extract from NC Landslide Hazard Mapping

It should be noted that the NC map is a broad-scale indication of the potential landslide susceptibility only,
largely based on ground slope, and is superseded by this site specific assessment.

The site does not exhibit any indicators of global, natural slope instability. No landslide back scarps or
areas of natural ‘hummocky’ ground were observed at or near the proposed shed site, however minor
erosion and slumping was observed in part of the fill batter which is likely due to existing surface drainage
conditions and uncontrolled fill. In addition, the subsurface conditions appeared favourable with stiff
residual soils and weathered rock encountered at relatively shallow depths within the Ground Drill
boreholes.

3.2   Qualitative Stability Assessment
The risk assessment for this project has been carried out following AGS 2007 Practice Note Guidelines for
Landslide Risk Management. Relative levels of risk and their implications are given in Table 1 below and the
document Qualitative Terminology for Use in Assessing Risk to Property, which is also attached.
Table 1: Stability Risk Levels
 Risk Level            Example Implications(1)
                       Unacceptable without treatment. Extensive detailed investigation and research, planning
       Very High
 VH                    and implementation of treatment options essential to reduce risk to Low; may be too
       Risk
                       expensive and not practical. Work likely to cost more than value of property.
                       Unacceptable without treatment. Detailed investigation, planning and implementation of
 H     High Risk       treatment options required to reduce risk to Low. Work would cost a substantial sum in
                       relation to the value of the property.
                       May be tolerated in certain circumstances (subject to regulators’ approval) but requires
       Moderate
 M                     investigation, planning and implementation of treatment options to reduce risk to Low.
       Risk
                       Treatment options to reduce to Low risk should be implemented as soon as practicable.
                       Usually acceptable to regulators. Where treatment has been required to reduce the risk
 L     Low Risk
                       to this level, ongoing maintenance required.
       Very Low
 VL                    Acceptable. Manage by normal slope maintenance procedures.
       Risk
 Note: (1) The implications for a particular situation are to be determined by all parties to the risk assessment and may
 depend on the nature of the property at risk; these are only given as a general guide .




                                                            9/14

Page 10

Mr Dean Frith                                                                                              21182-001-Rev0
                                                                                                              28 May 2021

Considering the existing site conditions (Ref. Section 2), and proposed development works, it is assessed that
there would be a Low (L) Risk of global slope instability affecting the proposed shed subject to the
implementation of recommendations given below. Regulators (NC) normally require that a Very Low or Low
Risk of landslide affecting the property must be demonstrated to enable development approval. Summarised
in Table 2 is our qualitative assessment of landslide risk for the site. A summary of qualitative terminology for
use in assessing risk to property is attached (taken from AGS 2007).
Table 2: Details of Qualitative Risk Assessment for Property (AGS 2007
                                                               Assessed
 Hazard                             Likelihood   Consequence
                                                                 Risk
                                                                          Comments

                                                                          The likelihood of a failure through the existing fill
                                                                          embankment to the north of the proposed shed
                                                                          location is assessed as Possible due to the firm
                                                                          consistency of the fill materials and slopes of the
                                                                          batters. The consequence of such a failure would be
                                                                          Minor with the resultant risk being Moderate as per
 1: Failure through fill             Possible                  Moderate   AGS 2007.
                                                    Minor
embankments                         (Unlikely)                  (Low)
                                                                          Failure of the fill embankment following remediation
                                                                          works as specified in Section 4 would be Unlikely.
                                                                          The consequence of such a failure would be
                                                                          Medium, with the resultant risk would reduce to
                                                                          Low as per AGS 2007.

                                                                          Given the presence of stiff residual soils and
                                                                          weathered rock materials at shallow depth, apparent
                                                                          lack of groundwater, and no evidence of instability in
                                                                          natural strata the vicinity of the proposed shed, it is
 2: Failure through natural soils
                                     Unlikely      Medium           Low   considered Unlikely that a landslip would develop,
above the foundation depths
                                                                          subject to implementation of the recommendations
                                                                          in Section 4. With a potential Medium impact from
                                                                          such shallow instability the resultant risk would be
                                                                          Low as per AGS 2007.

                                                                          The likelihood of a deep failure through the phyllite
                                                                          rock is assessed as Barely Credible due to the
 3: Deep seated failure in           Barely                               strength of these materials and no evidence of existing
                                                    Major      Very Low
weathered rock                      Credible                              instability in these materials. Although the
                                                                          consequence of such a failure could be Major, the
                                                                          resultant risk is Very Low as per AGS 2007.




The potential impacts on slope stability of the development components have been assessed, and the
measures recommended below in Section 4 have been designed to mitigate those impacts.




                                                            10/14

Page 11

Mr Dean Frith                                                                                    21182-001-Rev0
                                                                                                    28 May 2021

4.0       RECOMMENDATIONS
General recommendations to help maintain the stability of the site are given in the document Some
Guidelines for Hillside Construction, which is attached. This document should be referred to by those
preparing the design for the shed at the site.

4.1     Site Layout and Geotechnical Constraints
The proposed shed location described in Section 1.1 is considered acceptable from a slope stability
viewpoint. Tectonic must be consulted to assess the impacts on slope stability if development is proposed
elsewhere on the site.

4.2     Key Mitigation Measures
Recent instability has occurred in the fill embankment to the north. The following mitigation measures are
recommended from a geotechnical viewpoint to achieve a Low Risk of slope instability the shed from the
existing earthworks. It should be noted that this risk assessment excludes geotechnical risk that may be
associated with settlement due to consolidation of the uncontrolled fill material over time which could affect
non-piled structures (e.g. driveways, landscaping structures).
      1. The shed must be setback at least 1 m from the crest of the fill embankment.

      2. The fill embankment will need to be trimmed back to well compacted materials (to the lines of
         tension cracking) and flattened to a maximum grade of 1V:2.5H, or otherwise supported by an
         engineer designed and certified retaining wall.

      3. All batters should be protected from erosion by surface protection, the type of which will be
         dependent upon a number of factors including batter slope, material type, aspect, aesthetic finish
         required, etc. As a minimum, all soil batters should be topsoiled and seeded (or hydromulched) to
         establish a permanent grass (or similar vegetation) cover.

      4. As the existing fill platform is deemed to be uncontrolled, it is possible that unsuitable fill materials
         may be present within the fill. Therefore, to minimise future settlement due to consolidation of this fill
         it is recommended that the platform subgrade should be proof rolled using a fully laden water cart (or
         similar heavy onsite equipment) to identify any ‘soft spots’. Any such soft spots should be excavated
         and replaced with select fill material. Tree stumps and large roots must be ‘grubbed out’.

      5. Ongoing consolidation settlement of the fill is expected to occur over the long term as the particles
         realign to find an equilibrium position. Given the uncontrolled nature of the fill, settlement might be
         expected to be in the order of 1%H up to 2%H, where H is the height of fill. Differential settlements
         across the building pad from the cut to fill areas should be expected and accounted for in the design
         of adjacent surface or in ground elements (e.g. driveway slab and underground services).

      6. Diversion drainage must be installed above the crest of any cut/fill embankments to divert
         stormwater away. All stormwater must be directed by pipes or lined channels to discharge at least
         10 m downslope from any structure or embankment and not upslope of any neighbouring
         structures/embankments.


Subject to the above rehabilitation earthworks, and relatively conventional hillside construction practices
such as ensuring all footings for the proposed shed and ancillary structures (e.g. retaining walls) penetrate
through any fill and natural soils to found into underlying weathered rock, limiting future fill earthworks and
formalising onsite drainage, it is assessed that a Low Risk of instability affecting the proposed shed could be
achieved.
Specific recommendations relating to the above key measures and earthworks, footing design, retaining
walls and drainage are outlined in the sections below.




                                                        11/14

Page 12

Mr Dean Frith                                                                                           21182-001-Rev0
                                                                                                           28 May 2021

4.3       Earthworks
No further cutting (with the exception for remediation works) or filling should be carried out on site for the shed
area unless reviewed and approved by Tectonic. If further earthworks are planned Tectonic must review
potential impacts on slope stability.

All vegetation, tree stumps and large roots must be ‘grubbed out’ scross proposed building areas. Any
organic rich topsoil (although not anticipated) should then be stripped and set aside. Organic topsoils and
garden soils must not be re-used as fill; however, they may be retained on site for later use across
landscaping areas, if required. Ground surfaces should be graded to shed surface water runoff away from
construction areas.

Permanent batter slopes should be constructed as follows:

      ▪    Fill embankments to a maximum grade of 1V:2.5H
      ▪    Cut batters in natural soil consisting of stiff (or stiffer) clay to a maximum grade of 1V:2H
      ▪    Cut batters in weathered rock to a maximum grade of 1V:1H

Steeper batters should be re-profiled. Where spatial restrictions exist, batters should be retained by
engineer designed retaining walls (ref. Section 4.4 below).

Although trafficability should generally be good in ‘dry’ conditions, the soils could be subject to strength loss
from repetitive vehicle loading (particularly from rubber tyred plant) or if they become wet. Due to the
potential for poor trafficability during and after wet periods, placement of a minimum 150 mm thick granular
working platform may be required, particularly along access ways.

4.4       Retaining Structures
Retaining structures must be founded as described in Section 4.5 below. Retaining structures greater than
1 m high will require engineer design and certification of construction. Retaining structures should be
engineer designed in accordance with AS4678-2002 Earth-retaining structures.

We suggest the following parameters may be adopted for retaining wall design.
 Table 3: Retaining Wall Design Parameters
                                                                  Lateral earth pressure coefficients
                             Unit       Friction
 Retained material         weight        angle
                                                             Ka                      Ko
                           (kN/m3)     (Degrees)                                                         Kp
                                                      (Cantilever wall)      (Non-yielding wall)


 Firm to Stiff Clay           19           25               0.40                    0.57                2.46


 Weathered Rock               21           36               0.26                    0.41                3.85



These parameters do not include allowance for surcharge above the wall, or additional loads imposed by
sloping ground.

Subsurface drainage must be installed behind any retaining walls (e.g. slotted ‘aggi’ pipe wrapped in filter
‘sock’ placed in gravel backfill). Depending on matters such as the extent of drainage installed and site-
specific groundwater conditions, the designer must make an assessment of hydrostatic pressure to be
accounted for in the design of the retaining structure.

4.5       Footing Design
Footings for the proposed shed and any ancillary structures (e.g. tanks or retaining walls) should penetrate
through any fill, and residual soils, to found a minimum of 0.3 m into weathered rock. Footings so founded
may be designed using an allowable bearing pressure of 400 kPa. Footings located in cut areas may be
founded directly on weathered rock, and may therefore comprise conventional slab edge/internal beams,




                                                          12/14

Page 13

Mr Dean Frith                                                                                       21182-001-Rev0
                                                                                                       28 May 2021

with mass concrete placed to achieve the required depth as necessary. Elsewhere, given the depth to
weathered rock, it will be necessary to support structures on piles. Concrete bored piles are recommended
due to the presence of rock particles within the fill.
Footing design should also account for potential soil reactivity, advised by Ground Drill to be equivalent to
Class H1. Ongoing consolidation settlement of the fill is expected to occur over the long term as the particles
realign to find an equilibrium position. Given the uncontrolled nature of the fill and, settlement might be
expected to be in the order of 1%H up to 2%H, where H is the height of fill. Differential settlements across
the building pad from the cut to fill areas should be expected and accounted for in the design of adjacent
surface or in ground elements (e.g. driveway slab and underground services).

All footings should found such that they are not adversely affected by any adjacent excavations, trenches, or
retaining walls that are not designed to support building loads. Footings should found at least below a plane
extending 1 m horizontally from the base of trenches/excavations/retaining walls, then rising up at 1V:1H, as
illustrated in Text Figure 14.




           Text Figure 14: Footing depth required to minimise the risk of undermining and surcharge loading

Footing bases must be cleaned following mechanical excavation to expose undisturbed materials over the
full base area. A suitably qualified and experienced engineer should inspect the footing excavations to
confirm appropriate foundation materials and cleanliness prior to pouring concrete.

If any soil conditions encountered during construction are found to differ from those noted above, Tectonic
and Ground Drill must be notified immediately and an inspection carried out to determine if changes to
footing design are required.

4.6   Drainage
Adequate site drainage should be installed to ensure that stormwater runoff is directed away from the
building walls and footings (e.g. swales in landscaped areas or grated drains across pavements up slope of
structures). Diversion drainage should be installed above the crests of all cut/fill batters, and toes of all cut
batters. Future landscaping must be carried out to maintain good drainage.

Diversion drainage must be installed above the crest of any cut/fill embankments to divert stormwater away.
All stormwater must be directed by pipes or lined channels to discharge at least 5 m downslope from any
structure or embankment and not upslope of any neighbouring structures/embankments. Surface dissipation,




                                                         13/14

Page 14

Mr Dean Frith                                                                                   21182-001-Rev0
                                                                                                   28 May 2021

such as a rock weir or similar, must be installed at the stormwater outlet(s) to minimse the risk of soil erosion
at the discharge point.

Subsurface disposal of stormwater must not be undertaken.



5.0     SUMMARY & CONCLUSIONS
Based on the findings of our assessment we consider that there would be a Low Risk of slope instability
impacting the proposed shed. This advice is subject to implementation of the recommendations given in this
report.



6.0     LIMITATIONS
Your attention is drawn to the document Limitations, which is attached to this letter report.

Please contact the undersigned should you wish to discuss any of the above matters.
Yours faithfully

TECTONIC GEOTECHNICAL PTY LTD




Carissa Bruggemann BAppSc MEngSc                           Ashley Davey RPEQ 8159
Geotechnical Engineer                                      Principal Geotechnical Engineer


Attachments: Qualitative Terminology for Use in Assessing Risk to Property
             Some Guidelines for Hillside Construction
             Limitations




                                                       14/14

Page 15

                                      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                                                              APPENDIX C: LANDSLIDE RISK ASSESSMENT
                                    QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY


   QUALITATIVE MEASURES OF LIKELIHOOD

Approximate Annual Probability
                                             Implied Indicative Landslide
                                                                                                                     Description                                           Descriptor               Level
Indicative          Notional                    Recurrence Interval
  Value             Boundary
   10-1                5x10-2
                                              10 years                           The event is expected to occur over the design life.                                ALMOST CERTAIN                   A
                                                                    20 years     The event will probably occur under adverse conditions over the
        -2
   10                                      100 years
                                                                                 design life.
                                                                                                                                                                     LIKELY                           B
                            -3
     -3               5x10                                       200 years
   10                                      1000 years                            The event could occur under adverse conditions over the design life.                POSSIBLE                         C
                      5x10-4                                     2000 years
                                                                                 The event might occur under very adverse circumstances over the
   10-4                                   10,000 years
                                                                                 design life.
                                                                                                                                                                     UNLIKELY                         D
     -5               5x10-5                                     20,000 years
   10                                                                            The event is conceivable but only under exceptional circumstances
                                         100,000 years                                                                                                               RARE                             E
                                                                                 over the design life.
     -6                5x10-6                                    200,000 years
   10                                   1,000,000 years                          The event is inconceivable or fanciful over the design life.                        BARELY CREDIBLE                  F
   Note:     (1)   The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.


   QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

  Approximate Cost of Damage
                                                                                               Description                                                                 Descriptor               Level
Indicative           Notional
  Value              Boundary
                                         Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
   200%                                                                                                                                                             CATASTROPHIC                      1
                                         stabilisation. Could cause at least one adjacent property major consequence damage.
                     100%
                                         Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
   60%                                                                                                                                                              MAJOR                             2
                                         stabilisation works. Could cause at least one adjacent property medium consequence damage.
                       40%
                                         Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
   20%                                                                                                                                                              MEDIUM                            3
                                         Could cause at least one adjacent property minor consequence damage.
                       10%
    5%                 1%                Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                 MINOR                             4
                                         Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
   0.5%                                                                                                                                                             INSIGNIFICANT                     5
                                         notional boundary of 0.1%. See Risk Matrix.)
   Notes:    (2)   The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                   unaffected structures.
             (3)   The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                   works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                   accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
             (4)   The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa


                                                                    Australian Geomechanics Vol 42 No 1 March 2007
Form No. 68039
  68039        RL2Risk
         Landslide August 2010
                       Management Issued 10/7/07

Page 16

                                       PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
               APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


      QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                     LIKELIHOOD                                                  CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                          Indicative Value of         1: CATASTROPHIC                 2: MAJOR                3: MEDIUM                4: MINOR                    5:
                                         Approximate Annual                 200%                         60%                      20%                     5%                INSIGNIFICANT
                                             Probability                                                                                                                         0.5%
A –    ALMOST CERTAIN                             10-1                          VH                         VH                      VH                       H                   M or L (5)
                                                    -2
B -    LIKELY                                     10                            VH                         VH                       H                       M                       L
C -    POSSIBLE                                   10-3                          VH                          H                       M                       M                      VL

D -    UNLIKELY                                   10-4                           H                         M                        L                       L                      VL
                                                    -5
E -    RARE                                       10                             M                          L                       L                      VL                      VL
                                                    -6
F -    BARELY CREDIBLE                            10                             L                         VL                      VL                      VL                      VL
      Notes:   (5)   For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
               (6)   When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                     time.


      RISK LEVEL IMPLICATIONS
                        Risk Level                                                                                  Example Implications (7)
                                                                 Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
        VH                      VERY HIGH RISK                   options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                 property.
                                                                 Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
         H                           HIGH RISK
                                                                 risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                 May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
         M                      MODERATE RISK                    implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                 implemented as soon as practicable.
                                                                 Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
         L                           LOW RISK
                                                                 required.
                                                                 Acceptable. Manage by normal slope maintenance procedures.
         VL                      VERY LOW RISK

       Note:   (7)   The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
                     given as a general guide.




                                                                      Australian Geomechanics Vol 42 No 1 March 2007
 Form No. Landslide
    68039 68039 RL2Risk
                    August 2010
                        Management           Issued 10/7/07

Page 17

Foundation Maintenance

(i)

and Footing Performance: <,.,
A Homeowner's Guide aa

Buildings can and often do move. This movement can be up, down, lateral or rotational. The fundamental cause
of movement in buildings can usually be related to one or more problems in the foundation soil. It is important for
the homeowner to identify the soil type in order to ascertain the measures that should be put in place in order to

ensure that problems in the foundation soil can be prevented, thus protecting against building movement.

This Building Technology File is designed to identify causes of soil-related building movement, and to suggest

methods of prevention of resultant cracking in buildings.

Soil Types

The types of soils usually present under the topsoil in land zoned for
residential buildings can be split into two approximate groups —
granular and clay. Quite often, foundation soil is a mixture of both
types. The general problems associated with soils having granular
content are usually caused by erosion. Clay soils are subject to
saturation and swell/shrink problems.

Classifications for a given area can generally be obtained by
application to the local authority, but these are sometimes unreliable
and if there is doubt, a geotechnical report should be commissioned.
As most buildings suffering movement problems are founded on clay
soils, there is an emphasis on classification of soils according to the
amount of swell and shrinkage they experience with variations of
water content. The table below is Table 2.1 from AS 2870, the
Residential Slab and Footing Code.

[Seuses of Movement

Settlement due to construction

There are two types of settlement that occur as a result of

construction:

* Immediate settlement occurs when a building is first placed on its
foundation soil, as a result of compaction of the soil under the
weight of the structure. The cohesive quality of clay soil mitigates
against this, but granular (particularly sandy) soil is susceptible.

* Consolidation settlement is a feature of clay soil and may take
place because of the expulsion of moisture from the soil or because
of the soil’s lack of resistance to local compressive or shear stresses.
This will usually take place during the first few months after
construction, but has been known to take many years in
exceptional cases.

These problems are the province of the builder and should be taken

into consideration as part of the preparation of the site for construc-

tion. Building ‘Technology File 19 (BTF 19) deals with these
problems.

Erosion

All soils are prone to erosion, but sandy soil is particularly susceptible
to being washed away. Even clay with a sand component of say 10%
or more can suffer from erosion.

Saturation

This is particularly a problem in clay soils, Saturation creates a bog-
like suspension of the soil that causes it to lose virtually all of its
bearing capacity. To a lesser degree, sand is affected by saturation
because saturated sand may undergo a reduction in volume —
particularly imported sand fill for bedding and blinding layers.
However, this usually occurs as immediate settlement and should
normally be the province of the builder.

Seasonal swelling and shrinkage of soil

All clays react to the presence of water by slowly absorbing it, making
the soil increase in volume (sce table below). ‘The degree of increase
varies considerably between different clays, as does the degree of
decrease during the subsequent drying out caused by fair weather
periods. Because of the low absorption and expulsion rate, this
phenomenon will not usually be noticeable unless there are
prolonged rainy or dry periods, usually of weeks or months,
depending on the land and soil characteristics.

‘The swelling of soil creates an upward force on the footings of the
building, and shrinkage creates subsidence that takes away the
support needed by the footing to retain equilibrium.

Shear failure

This phenomenon occurs when the foundation soil does not have

sufficient strength to support the weight of the footing. There are

two major post-construction causes:

* Significant load increase.

¢ Reduction of lateral support of the soil under the footing due to
erosion or excavation.

* In clay soil, shear failure can be caused by saturation of the soil
adjacent to or under the footing.

 

 

 

 

 

 

 

 

 

 

 

GENERAL DEFINITIONS OF SITE CLASSES
Class Foundation
A Most sand and rock sites with little or no ground movement from moisture changes
SI Slightly reactive clay sites with only slight ground movement from moisture changes
M Moderately reactive clay or silt sites, which can experience moderate ground movement from moisture changes
H Highly reactive clay sites, which can experience high ground movement from moisture changes
[ Extremely reactive sites, which can experience extreme ground movement from moisture changes
AtoP Filled sites
P Sites which include soft soils, such as soft clay or silt or loose sands; landslip; mine subsidence; collapsing soils; soils subject
to erosion; reactive sites subject to abnormal moisture conditions or sites which cannot be classified otherwise

 

 

Page 18

Tree root growth
Trees and shrubs that are allowed to grow in the vicinity of footings
can cause foundation soil movement in two ways:

* Roots that grow under footings may increase in cross-sectional
size, exerting upward pressure on footings.

* Roots in the vicinity of footings will absorb much of the moisture
in the foundation soil, causing shrinkage or subsidence.

_Unevenness of Movement

The types of ground movement described above usually occur
unevenly throughout the building's foundation soil. Settlement due
to construction tends to be uneven because of:

* Differing compaction of foundation soil prior to construction.
° Differing moisture content of foundation soil prior to construction.

Movement due to non-construction causes is usually more uneven
still. Erosion can undermine a footing that traverses the flow or can
create the conditions for shear failure by eroding soil adjacent to a
footing that runs in the same direction as the flow.

Saturation of clay foundation soil may occur where subfloor walls
create a dam that makes water pond. It can also occur wherever there
is a source of water near footings in clay soil. This leads to a severe
reduction in the strength of the soil which may create local shear
failure.

Seasonal swelling and shrinkage of clay soil affects the perimeter of
the building firsc, then gradually spreads to the interion The swelling
process will usually begin ac the uphill extreme of the building, or on
the weather side where the land is flat. Swelling gradually reaches the
interior soil as absorption continues. Shrinkage usually begins where
the sun’s heat is greatest.

Effects of Uneven Soil Movement on Structures
Erosion and saturation

Erosion removes the support from under footings, tending to create
subsidence of the part of the structure under which it occurs.
Brickwork walls will resist the stress created by this removal of
support by bridging the gap or cantilevering until the bricks or the
mortar bedding fail. Older masonry has little resistance. Evidence of
failure varies according to circumstances and symptoms may include:

* Step cracking in the mortar beds in the body of the wall or
above/below openings such as doors or windows.

* Vertical cracking in the bricks (usually bur not necessarily in line
with the vertical beds or perpends).

Isolated piers affected by erosion or saturation of foundations will
eventually lose contact with the bearers they support and may tilt or
fall over. The floors that have lost this support will become bouncy,
sometimes rattling ornaments etc.

Seasonal swelling/shrinkage in clay

Swelling foundation soil due to rainy periods first lifts the most
er | extremities of the footing system, then the remainder of the
perimeter footings while gradually permeating inside the building
footprint ro lift internal footings. This swelling first tends to create a
dish effect, because the external footings are pushed higher than the
internal ones.

‘The first noticeable symptom may be thar the floor appears slightly
dished. This is often accompanied by some doors binding on the
floor or the door head, together with some cracking of cornice
mitres. In buildings with timber flooring supported by bearers and
joists, the oor can be bouncy. Externally there may be visible
dishing of the hip or ridge lines.

As the moisture absorption process completes irs journcy to the
innermost areas of the building, the internal footings will rise. If the
spread of moisture is roughly even, it may be thar the symptoms will
temporarily disappear, but it is more likely that swelling will be
uneven, creating a difference rather than a disappearance in
symptoms, In buildings with timber flooring supported by bearers
and joists, the isolated piers will rise more easily than the stri
footings or piers under walls, creating noticeable doming of flooring.

 

 

 

 

 

 

 

 

 

a)
oat
Wall cracking
due to uneven

footing settlement

As the weather pattern changes and the soil begins to dry out, the
external footings will be first affected, beginning with the locations
where the sun's effect is strongest. This has the effect of lowering the
external footings, The doming is accentuated and cracking reduces
or disappears where it occurred because of dishing, but other cracks
open up. The roof lines may become convex.

Doming and dishing are also affected by weather in other ways. In
areas where warm, wet summers and cooler dry winters prevail,
water migration tends to be toward the interior and doming will be
accentuated, whereas where summers are dry and winters are cold
and wet, migration tends to be toward the exterior and the
underlying propensity is toward dishing.

Movement caused by tree roots

In general, growing roots will exert an upward pressure on footings,
whereas soil subject wo drying because of tree or shrub roots will tend
to remove support from ander footings by inducing shrinkage.

Complications caused by the structure itself

Most forces that the soil causes to be exerted on structures are
vertical — i.e. either up or down. However, because these forces are
seldom spread evenly around the footings, and because the building
resists uneven movement because of its rigidity, forces are exerted
from one part of the building co another, The net result of all these
forces is usually rorational. This resultant force often complicates the
diagnosis because the visible symptoms do not simply reflect the
original cause. A common symptom is binding of doors on the
vertical member of the frame.

Effects on full masonry structures

Brickwork will resist cracking where it can. It will attempt to span
areas that lose support because of subsided foundations or raised
points. It is therefore usual to see cracking at weak points, such as
openings for windows or doors.

In the event of construction settlement, cracking will usually remain
unchanged after the process of settlement has ceased.

With local shear or erosion, cracking will usually continue to develop
iintil the original cause has been remedied, or until the subsidence
has completely neutralised the affected portion of footing and the
structure has stabilised on other footings that remain effective.

In the case of swell/shrink effects, the brickwork will in some cases
return to its original position after completion of a cycle, however it
is more likely that the rotational effect will not be exactly reversed,
and it is also usual chat brickwork will sectle in its new position and
will resise-the forces trying co return it to its original position. This
means that in a case where swelling takes place after construction
and cracking occurs, the cracking is likely to at least partly remain
after the shrink segment of the cycle is complete. Thus, each time
the cycle is repeated, the likelihood is that the cracking will become
wider until the sections of brickwork become virtually independent.

With repeated cycles, once the cracking is established, if there is no
other complication, it is normal for the incidence of cracking to
stabilise, as the building has the articulation it needs to cope with
the problem. This is by no means always the case, however, and
monitoring of cracks in walls and floors should always be treated
seriously.

Upheaval caused by growth of tree roots under footings is not a
simple vertical shear stress, There is a tendency for the root to also
exert lateral forces that attempt to separate sections of brickwork
after initial cracking has occurred.

Page 19

 

The normal structural arrangement is that the inner leaf of brick-
work in the external walls and at least some of the internal walls
(depending on the roof type) comprise the load-bearing structure on
which any upper floors, ceilings and the roof are supported. In these
cases, it is internally visible cracking that should be the main focus
of attention, however there are a few examples of dwellings whose
external leaf of masonry plays some supporting role, so this should
be checked if there is any doubt. In any case, externally visible
cracking is important as a guide to stresses on the structure generally,
and it should also be remembered that the external walls must be
capable of supporting themselves.

Effects on framed. structures

Timber or steel framed buildings are less likely to exhibit cracking
due to swell/shrink than masonry buildings because of their
flexibility. Also, the doming/dishing effects tend to be lower because
of the lighter weight of walls. The main risks to framed buildings are
encountered because of the isolated pier footings used under walls.
Where erosion or saturation cause a footing to fall away, this can
double the span which a wall must bridge. This additional stress can
create cracking in wall linings, particularly where there is a weak
point in the structure caused by a door or window opening. It is,
however, unlikely that framed structures will be so stressed as to suffer
serious damage without first exhibiting some or all of the above
symptoms for a considerable period. The same warning period should
apply in the case of upheaval. It should be noted, however, that where
framed buildings are supported by strip footings there is only one leaf
of brickwork and therefore the externally visible walls are the
supporting structure for the building. In this case, the subfloor
masonry walls can be expected to behave as full brickwork walls.

Effects on brick veneer structures

Because the load-bearing structure of a brick veneer building is the
frame that makes up the interior leaf of the external walls plus
perhaps the internal walls, depending on the type of roof, the
building can be expected to behave as a framed structure, except that
the external masonry will behave in a similar way to the external leaf
of a full masonry structure.

_ Water Service and Drainage

Where a water service pipe, a sewer or stormwater drainage pipe is in
the vicinity of a building, a water leak can cause erosion, swelling or
saturation of susceptible soil. Even a minuscule leak can be enough
to saturate a clay foundation. A leaking tap near a building can have
the same effect. In addition, trenches containing pipes can become
watercourses even though backfilled, particularly where broken
rubble is used as fill, Water that runs along these trenches can be
responsible for serious erosion, interstrata seepage into subfloor areas
and saturation.

Pipe leakage and trench water flows also encourage tree and shrub
roots to the source of water, complicating and exacerbating the
problem.

Poor roof plumbing can result in large volumes of rainwater being
concentrated in a small area of soil:

* Incorrect falls in roof guttering may result in overflows, as may
gutters blocked with leaves etc.

* Corroded guttering or downpipes can spill water to ground.

* Downpipes not positively connected to a proper stormwater
collection system will direct a concentration of water to soil that is
directly adjacent to footings, sometimes causing large-scale
problems such as erosion, saturation and migration of water under
the building.

|
Seriousness of Cracking
In general, most cracking found in masonry walls is a cosmetic
nuisance only and can be kept in repair or even ignored. The table
below is a reproduction of Table C1 of AS 2870.

AS 2870 also publishes figures relating to cracking in concrete floors,
however because wall cracking will usually reach the critical point
significantly earlier than cracking in slabs, this table is not
reproduced here.

 

Where building movement is caused by water service, roof plumbing,
sewer or stormwater failure, the remedy is to repair the problem.

It is prudent, however, to consider also rerouting pipes away from
the building where possible, and relocating taps to positions where
any leakage will not direct water to the building vicinity. Even where
gully traps are present, there is sometimes sufficient spill to create
erosion or saturation, particularly in modern installations using
smaller diameter PVC fixtures, Indeed, some gully traps are not
situated directly under the taps that are installed to charge them,
with the result that water from the tap may enter the backfilled
trench that houses the sewer piping. If the trench has been poorly
backfilled, the water will either pond or flow along the bottom of
the trench, As these trenches usually run alongside the footings and
can be at a similar depth, it is not hard to see how any water that is
thus directed into a trench can easily affect the foundation's ability to
support footings or even gain entry to the subfloor area.

Ground drainage

In all soils there is the capacity for water to travel on the surface and
below it. Surface water flows can be established by inspection during
and after heavy or protonged rain. If necessary, a grated drain system
connected to the stormwater collection system is usually an easy
solution.

It is, however, sometimes necessary when attempting to prevent
water migration that testing be carried out to establish watertable
height and subsoil water flows. This subject is referred to in BTF 19
and may properly be regarded as an area for an expert consultant.

Protection of the building perimeter

It is essential to remember that the soil that affects footings extends
well beyond the actual building line. Watering of garden plants,
shrubs and trees causes some of the most serious water problems.

For this reason, particularly where problems exist or are likely to
occur, it is recommended that an apron of paving be installed
around as much of the building perimeter as necessary. This paving

 

 

 

 

 

 

 

CLASSIFICATION OF DAMAGE WITH REFERENCE TO WALLS
Description of typical damage and required repair Approximate crack width Damage
limit (see Note 3) category

Hairline cracks <0.1 mm 0
Fine cracks which do not need repair <l mm 1
Cracks noticeable but easily filled. Doors and windows stick slightly <5 mm 2
Cracks can be repaired and possibly a small amount of wall will need 5-15 mm (or a number of cracks 3
to be replaced. Doors and windows stick. Service pipes can fracture. 3 mm or more in one group)
Weathertightness often impaired
Extensive repair work involving breaking-out and replacing sections of walls, 15-25 mm but also depend 4
especially over doors and windows. Window and door frames distort. Walls lean on number of cracks
or bulge noticeably, some loss of bearing in beams. Service pipes disrupted

 

 

 

 

 

 

Page 20

 

 

Clump of trees;
height selected
for distance
from house

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

— |. Drained
pathway

Carport

 

Path—+

 

 

 

 

 

 

 

Garden bed
covered with

[2 ay) mulch

pment
gp inca arrears
BUTT ete areenri
; a
areata

 

 

should extend outwards a minimum of 900 mm (more in highly
reactive soil) and should have a minimum fall away from the
building of 1:60. The finished paving should be no less than 100
mm below brick vent bases.

It is prudent to relocate drainage pipes away from this paving, if
possible, o-ayoid complications from future leakage, If this is not
pesaics. earthenware pipes should be replaced by PVC and

ackfilling should be of the same soil type as the surrounding soil
and compacted to the same density,

Except in areas where freezing of water is an issue, it is wise to
remove taps in the building area and relocate them well away from
the building — preferably not uphill from it (see BTF 19).

It may be desirable to install a grated drain at the outside edge of the
paving on the uphill side of the building. IF subsoil drainage is
needed this can be installed under the surface drain.

Condensation

In buildings with a subfloor void such as where bearers and joists
support flooring, insufficient ventilation creates ideal conditions for
condensation, particularly where thete is little clearance berween the
floor and the ground. Condensation adds ro the moisture already
present in the subfloor and significantly slows the process of drying
our. Installation of an adequate subfloor ventilation system, either
natural or mechanical, is desirable.

Warning: Although this Building Technology File deals with
cracking in buildings, it should be said thar subfloor moisture can
result in the development of other problems, notably:

© Water that is transmitted into masonry, metal or timber building
elements causes damage and/or decay to those elements.

* High subfloor humidity and moisture content create an ideal
environment for various pests, including termites and spiders.

¢ Where high moisture levels are transmitted to the flooring and
walls, an increase in the dust mite count can ensue within the
living areas. Dust mites, as well as dampness in general, can be a
health hazard to inhabitants, particularly those who are
abnormally susceptible to respiratory ailments.

The garden

‘The ideal vegetation layout is to haye lawn or plants that require
only light watering immediately adjacent to the drainage or paving
edge, then more demanding plants, shrubs and trees spread out in
that order.

Overwatering due to misuse of automatic watering systems is a
common cause of saturation and water migration under footings. If
it is necessary to use these systems, it is important to remove garden
beds to a completely safe distance from buildings.

Existing trees

Where a tree is causing a problem of soil drying or there is-the
existence or threat of upheaval of footings, if the offending roots are
subsidiary and their removal will nor significantly damage the tree,
they should be severed and a concrete or metal barrier placed
vertically in the soil to prevent furure root growth in the direction of
the building. IF it is not possible co remove the relevant roots
without damage to the tree, an application to remove the tree should
be made to the local authority. A pradent plan is to transplant likely
offenders before they become a problem.

Information on trees, plants and shrubs

State departments overseeing agriculture can give information
regarding root patterns, volume of water needed and safe distance
from buildings of most species. Botanic gatdens are also sources of
information. For information on plant roots and drains, see Building
Technology File 17.

Excavation

Excavation around footings must be properly engineered. Soil
supporting footings can only be safely excavated at an angle that
allows the soil under the footing to remain stable, This angle is
called the angle of repose (or friction) and varies significantly
between soil types.and conditions. Removal of soil within the angle
of repose will cause subsidence.

peomesiauce

Where erosion has occurred that has washed away soil adjacent to
footings, soil of the same classification should be introduced and
compacted to the same density, Where footings have been
undermined, augmentation or other specialist work may be required.
Remediation of footings and foundations is generally the realm of a
specialist consultant.

Where isolated footings rise and fall because of swell/shrink effect,
the homeowner may be tempted to alleviate floor bounce by filling
the gap that has appeared between the bearer and the pier with
blocking. The danger here is thar when the next swell segment of the
cycle occurs, the extra blocking will push the floor up into an
accentuated dome and may also cause local shear failure in the soil.
IF it is necessary to use blocking, it should be by a pair of fine
wedges and monitoring should be cartied out fortnightly.

This BTF was prepared by John Lewer FAIB, MIAMA, Partner,
Construction Diagnosis.

 

The information in this and other issues in the series was derived from various sources and was believed to be correct when published.

The information is advisory. It is provided in good faith and not claimed to be an exhaustive treatment of the relevant subject.

Further professional advice needs to be obtained before taking any action based on the information provided.

Distributed by

 

CSIRO PUBLISHING PO Box 1139, Collingwood 3066, Australia

Freecall 1800 645 051

Tel (03) 9662 7666

Fax (03) 9662 7555 www.publish.csiro.au

Email: [email protected]

© CSIRO 2003. Unauthorised copying of this Building Technology file is prohibited

Page 21

                                               LIMITATIONS


This document has been prepared for the purpose outlined in Tectonic’s proposal and no responsibility is
accepted for the use of this document, in whole or in part, for any other purpose.

The scope of Tectonic’s Services are as described in Tectonic’s proposal, and are subject to restrictions
and limitations. Tectonic did not perform a complete assessment of all possible conditions or
circumstances that may exist at the site referenced in the report. If a service is not expressly indicated, do
not assume it has been provided. If a matter is not addressed, do not assume that any determination has
been made by Tectonic in regards to it.

Conditions may exist which were undetectable given that economic and time constraints limit the practical
extent of geotechnical investigation. Variations in conditions may occur between investigation locations,
and there may be special conditions pertaining to the site which have not been revealed by the
investigation and which have not therefore been taken into account in the document. Where variations exist
on site, additional studies and actions may be required.

Tectonic’s opinions are based upon information that existed at the time that the work was performed. The
passage of time, man-made or natural events, may alter the site conditions. It is understood that the
Services undertaken allowed Tectonic to form an opinion of the actual conditions of the site at the time the
site was visited and cannot be used to assess the effect of any subsequent changes in the quality of the
site, or its surroundings, or any laws or regulations.

Any assessments made in the preparation of this document are based on the conditions indicated from
published sources and the findings of the investigation described. Actual subsurface conditions may differ
from those indicated in the document (e.g. between boreholes or test pits). No warranty is included, either
express or implied, that the actual conditions will conform exactly to the assessments contained in this
document.

Where data supplied by the client or other external sources, including previous site investigation data, have
been used, it has been assumed that the information is correct unless otherwise stated. No responsibility is
accepted by Tectonic for incomplete or inaccurate data supplied by others.

This document is provided for the sole use by the Client and its professional advisers. No responsibility
whatsoever for the contents of this document will be accepted to any person other than the Client. Any use
which a third party makes of this document, or any reliance on or decisions to be made based on it, is the
responsibility of such third parties. Tectonic accepts no responsibility for damages, if any, suffered by any
third party as a result of decisions made or actions based on this document.




Rev 1 (March 2016)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.