Approved Plan - EXE21-0015

of 21

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Mr Dean Frith                                                                                    21182-001-Rev0
                                                                                                    28 May 2021

The existing building platform has been formed by cut and fill earthworks. It is estimated that fill in this area
ranged up to 1.5 m high, with cuts up to 1 m depth. Design drawings by Best Sheds (ref. Job No.
1713555893, Sheets 1 to 8, dated 8 February 2021) detail the shed will have a plan area of 12 m by 7.5 m
and will comprise a concrete slab on ground floor with steel framing and sheet metal cladding to the walls
and roof. The shed is proposed to be located approximately 1 m off the cut face and ranges approximately
1 m to 5 m off the crest of the fill batter.




                            Approx. site of proposed shed     Gravel access driveway




             Bitumen driveway




Text Figure 2: Approximate site layout of proposed shed (courtesy of nearmap, 2021)


1.2    Method and Scope of Investigation
As part of our slope stability assessment, a desk-top study was carried out comprising a review of
published geological maps, aerial photos, and a ‘soil test’ report prepared by Ground Drill (Ref. 21/213,
dated 27 April 2021).

A walk-over survey was conducted in order to make an appraisal of the general condition of the site in
regard to topography, drainage, vegetation cover, geology, erosion and slope stability and existing
structures. The walk-over survey was carried out by an experienced geotechnical engineer from Tectonic
on 14 May 2021.
The results of the desk-top study and walk-over survey are included in Section 2 below.

1.3    Qualifications of Responsible Engineer
This report has been reviewed by Mr Ashley Davey, an RPEQ with more than 25 years’ experience in
geotechnical engineering, including a number of slope stability projects.




                                                            2/14
Log in to download the original file

Approved Plan - EXE21-0015.pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.