Approved Plan - EXE21-0015
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnMr Dean Frith 21182-001-Rev0
28 May 2021
Text Figure 9: Looking east over slump, tension cracking and rill erosion within the fill embankment
2.3 Groundwater
No seepage or ‘springs’ were observed in the vicinity of the proposed development area. No groundwater
was encountered in the Ground Drill boreholes with the soils being described as mostly ‘moist’.
Groundwater conditions may vary seasonally, and groundwater seepage could develop, particularly
following periods of prolonged or heavy rainfall.
2.4 Surface Drainage
Broadly, natural surface drainage follows the ground surface contours to the north and north-east. A small
pond was located to the north, well downslope of the proposed shed location. A spoon drain was installed
between the cut batter and the access driveway upslope of the proposed building platform, which diverts
upslope stormwater towards the west into a grated inlet, then under the driveway, discharging onto the fill
embankment (Ref. Text Figure 10). Erosion of the fill embankment was observed at this location.
Text Figure 10: Spoon drain upslope of building platform (LHS) and discharge point onto fill embankment (RHS)
7/14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.