Original source · versioned page text
MCU15/0095 & REC15/0022 PM Submission Object - Various - Petition Kelly Gerber
Very large file (14.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.
"
25. The Noosaville Locality Plan at Division 16, section 11.8.2, states that one of the
overall outcomes sought for the Noosaville locality is that new uses and works are
located, designated and managed to maintain the safety of people.
26. It also requires that GSLC(as a community services zone) is protected and managed to
enable the efficient and timely delivery of community services and is consistent with
the infrastructure, indoor and outdoor recreation, education, social and safety needs
of the local community, including people with special needs, such as the elderly,
children, low income earners and disabled persons.
27. A Specific Outcome for the Noosaville Locality Plan, Division 17 at section 11.9
includes:
01 Amenity - Uses are located, designed and operated to avoid significant adverse changes
to the light, air quality, noise, accessibifity or other conditions enjoyed by users of associated,
adjoining or nearby uses.
28. Furthermore, Part 14 of the Noosa Plan, states at Table 14-15 that the specific
outcomes required for a service station development are as follows:
• 080 - Buildings, structures, driveways, tanks and fuel bowsers are sited to-
0) ensure the safe and efficient use of the site;
b) maintain visual amenity and streetscape character;
c) provide adequate separation to adjoining land uses; and
d) nat cause an environmental nuisance to neighbouring praperties.
• 082 - The layout and design of the service station ensures that an site operations
do not cause any environmental nuisance or harm or result in the release of
untreated pollutants.
The development application
29. The proposed DA at 115 Eumundi Road Noosaville comprises:
• Service Station building/shop
• 10 car parking spaces and 2 motor cycles spaces
• 1 refuelling canopy over 3 fuel dispensers with 6 filling positions
• 3 x 60kL (or 180,000 litres3) underground fuel tanks. (Although it is noted on the
Proposed Site Layout Plan that "Total Fuel storage will not exceed 500,000L")
• 1 loading service bay
• Refuse point- the applicant has not advised what times collection will occur
• Fuel delivery - the applicant has not advised what times this will occur
, Unleaded 91- GO,OOOL;unleaded 95 - 30,OOOL; unleaded 98 - GO,OOOLand diesel- GO,OOOL.The site will be
provisioned with underground pipe VR2.
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.