Original source · versioned page text
Planning Report
Specific Outcomes Probable solutions Proposal
closest boundary of habitable
buildings and child activity areas, as
follows—
a) 20m for transmission lines up to
132kV;
b) 30m for transmission lines
between 133kV and 275kV; and
c) 40m for transmission lines
greater than 275kV.
Hot W ater System s
O3 Hot water systems are installed S3.1 All hot water systems installed Complies
and operated to support the are— An appropriate hot water system
efficient use of natural resources a) solar systems; or will be installed.
and minimise consequent pollution b) electric heat pump systems; or
such as greenhouse gas emissions. c) natural gas or LPG systems; or
d) any combination of a), b) or c).
W ater supply and conservation
O4 On-site water storage is S4.1 & S5.1 For a Class 1 building Not Applicable
designed and operated to support other than a Detached house or The site is within a reticulated water
the efficient use of water; Multiple Housing Type 1, outside area.
AND a reticulated water service area, a
O5 On-site water storage is rainwater tank is to be installed
adequate for occupants every day with the following minimum storage
use and fire fighting purposes. capacities—
a) Where no more than 3 bedrooms
– 45,000 litres; or
b) Where more than 3 bedrooms –
60,000 litres;
AND
c) There is to be on the lot a dam,
swimming pool or water tank
accessible for use by the fire
brigade that contains at least 5,000
litres of water.
Advisory note
The 5,000 litres required can be
included within the water required in
S4.2 or S5.1 providing it is accessible for
the purpose of fire fighting at all times
and not used for other domestic
purposes.
Erosion and sedim ent control Complies
O6 Development does not cause No solution provided. Development will not cause erosion
erosion or result in transport of or result in the transport of
sediments off-site. Advisory N ote sediments off-site. This will be
Persons undertaking development, addressed in further detail as part
including building work, are required of a subsequent operational works
under the Environmental Protection
application.
(Water) Policy 1997 (EPP) to ensure that
sediment and other material including
building waste, sawdust, concrete,
cement or paint are not deposited or
released into a roadside gutter,
stormwater drain or waterway, or into a
place where it could reasonably be
expected to move or be washed into a
roadside gutter, stormwater drain or
waterway and are not washed from the
site. Council enforces the EPP and
penalties may apply.
Safety and security
O7 For Multiple Housing Types S7.1 The building entrance is Complies
2, 3 and 4, buildings and outdoor clearly identifiable and visible from The proposed residential building
spaces are designed to protect the the street, footpath and driveway; provides clear, identifiable and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.