Council archive · source document
MCU14/0045 & OPW14/0268: Appendix D - Engineering Works codes
Appendix D: Engineering Works Codes
EXISTING SERVICES CODE
PERFORMANCE CRITERIA ACCEPTABLE SOLUTIONS COMMENTS
and Sewerage and Section 4 of PSP5 –Engineering
Design Standards – Roads, Drainage and
Earthworks; OR
S1.6 Existing services are relocated and the design
and construction of the relocated services is in
accordance with PSP6 –Engineering Design
Standards — Water and Sewerage and Section 4 of
PSP5 –Engineering Design Standards – Roads,
Drainage and Earthworks.
O2 Maintenance access is provided to all sewers, S2.1 A registered easement in favour of Council is Not applicable. No existing or proposed services within
water mains, stormwater drains, overland flow paths created over all underground infrastructure located private property.
and associated structures. in private property; AND
S2.2 The width of the easement is the greater of 3m
or the width of the zone of influence; AND
S2.3 The easement is centred over the centreline of
the infrastructure.
TRANSPORT, ROADS AND DRAINAGE CODE
PERFORMANCE CRITERIA ACCEPTABLE SOLUTIONS COMMENTS
14.145 Strategic Transport Network
O1 Traffic generation from the development is S1.1 Where the development leads to the need to The traffic demand generated by the proposed
considered in a localised and a Shire wide context to increase transport infrastructure in the Shire, the development is considered to be consistent with a
ensure that— development contributes to the transport network in typical single allotment development. It is presumed
accordance with the requirements of the applicable that external transport and road infrastructure has been
a) the transport network has the capacity to safely infrastructure charging instrument and the Priority designed to accommodate this and will not be
and efficiently accommodate projected movements; Infrastructure Plan in Part 15; and where upgraded.
and/or developments requires infrastructure not included in
b) the development includes measures to upgrade the priority infrastructure plan, the development
the transport network to meet the imposed demands. upgrades the infrastructure at no cost to Council.
O2 The street network has high street connectivity, S2.1 Road planning and development design Not applicable, single allotment development.
CadCon Surveying & Town Planning
Page 10 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0045 & OPW14/0268: Appendix D - Engineering Works codesRelated documentApplication case desk ↗
About this file
- File size
- 193 KB (small file)
- File type
No other editions are linked here.