Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-08-06 Services & Organisation Committee Agenda

of 170

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                                6 AUGUST 2019


BRANCH ACTIVITIES                            RECENT ACHIEVEMENTS                          CURRENT PRIORITIES                           THE NEXT QUARTER
Finalising the policy/process for planting      Management review completed.               Finalise policy & guideline & present      Workshop policy & guideline with
in and managing structures in the road                                                         to Roads Asset Steering Group for            Council.
reserve                                                                                        endorsement.
Establish a Memorandum of                       Liaise with Property Branch to             Finalise permit for FNBG the               Revise draft MOU in consultation
Understanding between Council & the               arrange for permit covering the              propagation shed.                            with FNBG for consideration by
Friends of Noosa Botanic Gardens                  operation of the propagation shed                                                         Council.
Contribute to improved asset                    Progressed maintenance works on            Staff involvement in Bridge Working        Ongoing participation in Asset
management outcomes                               bio basins & review of the                   Group sub group to formulate a               Working Groups.
                                                  maintenance & management                     guardrail renewal program.
                                                  strategy for bio basins incl handover      Review street lighting condition
                                                  to Environmental Services.                   audit & report to Roads Working
                                                Development of 19/20 Resurfacing             Group regarding street lighting
                                                  Program in conjunction with Asset            strategy & renewal including
                                                  Planning Branch.                             consideration of LED technology.
Ensure Council’s engaged contractors            Completed audit of tree services           Ongoing monitoring of contractor           Ongoing monitoring of contractor
are appropriately managed                         contractors incorporating WH&S               performance & operation of panel             performance & operation of panel
                                                  requirements, service delivery &             arrangements                                 arrangements
                                                  work quality.
Delivery of 90% of Capital Works                Completion of several capital              Finalise work on Swan Av. drainage         Commence civil infrastructure
Program as approved by CWE                        projects/programs including:                 rehabilitation.                              renewal programs including: road
                                                  Gravel Road resheeting Program           Commencing preparation works for             resurfacing, pathway, kerb &
                                                  Sealed road resurfacing program            resurfacing program.                         channel and stormwater assets.
                                                  Bicentennial Drive carpark               Development of gravel road                 Playground renewal A W Dan Park
                                                     improvements.                             resheeting program.                        Noosa Botanic Gardens irrigation
                                                                                             Commence procurement for A W                 renewal and signage
                                                                                               Dan Park Playground renewal
Implementation of Branch Workforce              Three officers from Parks completed        Roll out of “MyPlan” Development           Review Branch Workforce Plan in
Plan                                              a Tree Risk Assessment course                Plans to outdoor staff                       conjunction with People & Culture
                                                  through the Queensland                                                                  Branch
                                                  Arboricultural Association and have                                                     Heavy vehicle driver training
                                                  achieved an internationally
                                                  accredited qualification.
                                                1st group of truck drivers completed
                                                  heavy vehicle driver training
                                                Erosion and Sediment Control
                                                  Training conducted for both field
                                                  staff & technical officers.
                                                Second group of supervisor training
                                                  completed.

                                                                                                  Page 90 of 170
Log in to download the original file

2019-08-06 Services & Organisation Committee Agenda(PDF, 13MB).pdf · 13.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.