Original source · versioned page text
2019-08-06 Services & Organisation Committee Agenda
The original of this document is very large (13.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 6 AUGUST 2019
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
PTAIP DDA Bus stop compliance 2018/2019 Bus stop construction Preparation for 2019/2020 PTAIP
program – continued delivery of the program and handover / finalisation DDA Bus program continues.
program. completed.
Park Road Boardwalk – supervise Completion of project under budget Preparation of maintenance manual Actions for temporary path
project to ensure delivery on time and on ahead of time. Consider actions for temporary path
budget.
Business as Usual activities Construction complete for Recruitment of Project Coordinator Delivery of Peregian Beach
demolition of SLSQ building, Swan position. Boardwalk, Gympie Terrace corridor
Avenue creek restoration, Delivery of Peregian Beach upgrade Stage 2 and Gympie
Castaways Beach carpark upgrade, Amenities, Botanic Gardens Shade Terrace Stormwater renewals,
Bicentennial Carpark upgrade, Stan structure, Noosa Shore Rufous Street Stage 3, Hilton
Topper Park Basketball renewal, Jo Campground upgrade, and delivery Terrace intersection and corridor
Bazzo Park BBQ and pathways, of Hilton Terrace service upgrade and Black Mountain Road.
Noosaville Library weather relocations. Consultation and seeking grant
protection and Cooroy Library Air Finalisation of tender documents for funding for Noosa Parade corridor
conditioner plant room enclosure. Peregian Beach Boardwalk, Gympie upgrade.
Construction underway on Noosa Terrace corridor upgrade Stage 2 Planning of Noosa Cycling and
Botanic Gardens shade structure, and Gympie Terrace Stormwater, Walking strategy including sport and
Peregian Amenities and Noosa Orealla Crescent Bridge, Rufous recreation plan. 3 TMR CNLGG
North Shore Campground. Street Stage 3, Hilton Terrace corridor analysis for Tewantin to
Design complete for Noosa Parade intersection and corridor upgrade Noosa Heads, Noosa Heads to
Corridor upgrade and has been and Black Mountain Road. Marcus Beach, Marcus Beach to
submitted to TMR for review and Designs progressing for Peregian Shire Boundary. Precinct planning
approval. Beach Boardwalk, Project Avenue for Noosa Drive and Noosa Heads
Successful recruitment of Contract stormwater upgrade, Black Precinct.
Superintendent Officer. Temporary Mountain Road, Peregian Town Design and delivery of Doonella
Design and 1 Project Coordinator Square, Sea Eagle Drive safety Bridge, Orealla Crescent Bridge, Kin
positons. improvements, and O-Boats Kin Wahpunga Lane Bridge and
retaining wall. Cooran tableland Road B Bridge
Design support for Tewantin Bypass renewal, Teewah Street, Hector
- Beckman’s Road, Cooroy Street and Ambulance Street.
Connection Roads projects, Noosa
Civic Stage 2 and Transport
Strategy.
Page 93 of 170
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.