ww PIVOTAL 24/04/2025 Development Assessment Noosa Council [email protected] RE: Minor Change Request —MCU22/0172.01, OPW22/0243.01, RAL22/0024.01 — dual occupancy and associated operational works at 22 Grant St, Noosa Heads Proposal The applicant seeks minor changes to the combined development approvals MCU22/0172.01, OPW22/0243.01, RAL22/0024.01. The amendment to the approved plans are URGENTLY sought to account for the stormwater tanks being located along the side boundaries and the size of the inlet pit to the street being reduced in size. A copy of the approved plans and updated plans are included below. REC*:R cenmanenate . = GGQ REC3:R w Sess... Figure.2 — Approved and Proposed Stormwater layout plans
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
ww PIVOTAL Figure.3 — Approved and Proposed Landscape plans Background e 25 January 2023 - Council Approval e 5 June 2023 — Minor Change issued for changes to the frontages and additions for a lift e 8April 2025 — Final Plan Seal Inspection Minor Change Test An assessment against the meaning of minor change and a response about the proposed application is provide below. The Planning Act 2016 defines a minor change as a change to the approval that: i. would not result in a substantially different development’; (“In determining whether the proposed change would result in substantially different development, the assessment manager or referral agency must consider the individual circumstances of the development, in the context of the change proposed.) Schedule 1 of the Development Assessment Rules set outs provisions for a substantially different development. A change may be considered to result in a substantially different development if the proposed change results in any of the following outlined in Table 1 below. Table 1 - Substantially different development Provisions of Schedule 1 of the DA Rules Response (a) Involves a new use There is no new use proposed onsite (b) results in the application ap plying to a new parcel of land; or No new parcel of land is introduced (c) dramatically changes the built form in terms of scale, bulk and appearance; or Although the design changes slightly, the building is sited in the same location as approved with the same height, setbacks, plot ratio and site cover. The modification to the approved plans do not dramatically change the scale, bulk or appearance of the development. changes the ability of the proposed development to operate as intended; or No change to the use approved. removes acomponent that is integral to the operation of the development; or No essential component of the development is proposed to be removed. significantly impacts on traffic flow and the transport network, such as increasing traffic to the site; or The proposal does not trigger any additional traffic or car parking to that originally approved. introduces new impacts or increase the severity of known impacts; or No newimpacts or the severity of impacts is likely to result from the plan modifications.
Page 3
~ PIVOTAL (h) removes an incentive or offset component that Does notremove an offset or incentive components would have balanced a negative impact of the of the development. development; or (i) impacts on infrastructure provisions. Thereis no additional impacts on infrastructure. Given the above, the proposed change to the existing approval is a minor change in accordance with Schedule 2 of the Planning Act 2016 and Schedule 1 of the Development Assessment Rules. Deciding the Request In accordance with S81 of The Planning Act 2016, Council must only consider the information provided and any other matter considered relevant, including — all matters Council would or may assess against or have regard to, if the change application were a development application. Council must only consider the statutory instrument, or other document, as in effect when the development application for the development approval was properly made. However, may give weight they consider appropriate, in the circumstances, to— (a) the statutory instrument or other document as in effect when the change application was made (Superseded Planning Scheme); or (b) if the statutory instrument or other document is amended or replaced after the change application is made but before it is decided—the amended or replacement instrument or document; or (c) another statutory instrument— (i) that comes into effect after the change application is made but before it is decided; and (ii) that the responsible entity would have been required to consider if the instrument had been in effect when the development application for the development approval was properly made. Therefore, in accordance with the above the proposal is assessed against the conditions of approval and the Noosa Plan 2020. The proposal complies with all these instruments and approval and is discussed below.
Page 4
PIVOTAL Assessment The key development parameters from the existing approval are outlined below and an assessment of the differences is provided thereafter. Table 2— Development Parameters Criteria Approval Proposal Compliance Boundary setbacks (up to 4.5m height) * Side 1.5m (NW) 1.5 metres 0.3m to tank PO * Side 1.5m (SE) 1.5 metres 0.3m to tank PO Landscaped open space 239m? (40%) 238m* (40%) Both comply Soft landscaping 173m? 169m? Both comply As outlined in the Table, the proposal is generally in accordance with the existing approval apart from the new slimline 3,000L water tank being located along the boundaries. The tanks were put in after the construction of the building after it was decided to not locate the tanks under the driveway. A picture of the slimline tanks is included below. r~, Figure.4 — Photos of 3,000L slimline tanks (southern and northern side boundaries) The Noosa Plan 2006 included rainwater tanks as being part of the landscaped area, whereas the current Noosa Plan 2020 definitions do not specifically mention rainwater tanks. Rainwater tanks are not assessable building work for houses, but they are for dual occupancies. A copy of the relevant definitions are included below. landscaped area (including landscaped buffer areas, landscaped building setback and landscaping) means part of a site comprising predominantly soft landscaping and set aside for the purposes of enhancing or protecting the amenity of the site. The term includes the areas occupied by a rainwater tank and bicycle racks, swimming pools or ponds and garden paths, but does not include impervious surfaces such as driveways, vehicle access lanes, vehicle parking and manoeuvring areas, waste storage areas, and the like. Figure.5 — Noosa Plan 2006 definition for Landscaped Area landscaped area (including landscaped buffer areas, landscaped building setback and landscaping) means part of a site comprising predominantly soft landscaping and set aside for the purposes of enhancing or protecting the amenity of the site. The term includes the areas occupied by bicycle racks, swimming pools or ponds and garden paths, but does not include impervious surfaces such as driveways, vehicle access lanes, vehicle parking and manoeuvring areas, waste storage areas, and the like. Figure.6 — Noosa Plan 2020 definition for Landscaped Area
Page 5
PIVOTAL The changes to the location of the tanks still meet the required minimum landscaped area requirements. The location of plantings in front of the tanks also still provide for landscaping along boundaries with adjoining premises — consistent with the requirements of The Noosa Plan. Changes to Conditions As a result of the proposed changes the following conditions require changing: Approved Plans Update the approved plans to show the additional tanks. - MCU Plans (add additional plan by Archend) - OPW Plans (replace stormwater plan by Recor and Element with updated tanks shown) If you have any further queries in relation to the above, please do not hesitate to contact myself. Regards, Jack Lewis B.Sc Hons UNSW M.Plan Otago RPIA Planner/Director Pivotal Perspective Pty Ltd 0406 334 227