planning report minor change

of 5

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

ww

PIVOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure.3 — Approved and Proposed Landscape plans

Background

e 25 January 2023 - Council Approval
e 5 June 2023 — Minor Change issued for changes to the frontages and additions for a lift
e 8April 2025 — Final Plan Seal Inspection

Minor Change Test

An assessment against the meaning of minor change and a response about the proposed
application is provide below. The Planning Act 2016 defines a minor change as a change to the
approval that:

i. would not result in a substantially different development’;
(“In determining whether the proposed change would result in substantially different development, the
assessment manager or referral agency must consider the individual circumstances of the development, in the
context of the change proposed.)

Schedule 1 of the Development Assessment Rules set outs provisions for a substantially different
development. A change may be considered to result in a substantially different development if the
proposed change results in any of the following outlined in Table 1 below.

Table 1 - Substantially different development

 

Provisions of Schedule 1 of the DA Rules Response

 

(a)

Involves a new use

There is no new use proposed onsite

 

(b)

results in the application ap plying to a new parcel of
land; or

No new parcel of land is introduced

 

(c)

dramatically changes the built form in terms of
scale, bulk and appearance; or

Although the design changes slightly, the building is
sited in the same location as approved with the
same height, setbacks, plot ratio and site cover. The
modification to the approved plans do not
dramatically change the scale, bulk or appearance
of the development.

 

changes the ability of the proposed development to
operate as intended; or

No change to the use approved.

 

removes acomponent that is integral to the
operation of the development; or

No essential component of the development is
proposed to be removed.

 

significantly impacts on traffic flow and the transport
network, such as increasing traffic to the site; or

The proposal does not trigger any additional traffic
or car parking to that originally approved.

 

 

introduces new impacts or increase the severity of
known impacts; or

 

No newimpacts or the severity of impacts is likely to
result from the plan modifications.

 

 
Log in to download the original file

planning report minor change.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.