planning report minor change
ww PIVOTAL Figure.3 — Approved and Proposed Landscape plans Background e 25 January 2023 - Council Approval e 5 June 2023 — Minor Change issued for changes to the frontages and additions for a lift e 8April 2025 — Final Plan Seal Inspection Minor Change Test An assessment against the meaning of minor change and a response about the proposed application is provide below. The Planning Act 2016 defines a minor change as a change to the approval that: i. would not result in a substantially different development’; (“In determining whether the proposed change would result in substantially different development, the assessment manager or referral agency must consider the individual circumstances of the development, in the context of the change proposed.) Schedule 1 of the Development Assessment Rules set outs provisions for a substantially different development. A change may be considered to result in a substantially different development if the proposed change results in any of the following outlined in Table 1 below. Table 1 - Substantially different development Provisions of Schedule 1 of the DA Rules Response (a) Involves a new use There is no new use proposed onsite (b) results in the application ap plying to a new parcel of land; or No new parcel of land is introduced (c) dramatically changes the built form in terms of scale, bulk and appearance; or Although the design changes slightly, the building is sited in the same location as approved with the same height, setbacks, plot ratio and site cover. The modification to the approved plans do not dramatically change the scale, bulk or appearance of the development. changes the ability of the proposed development to operate as intended; or No change to the use approved. removes acomponent that is integral to the operation of the development; or No essential component of the development is proposed to be removed. significantly impacts on traffic flow and the transport network, such as increasing traffic to the site; or The proposal does not trigger any additional traffic or car parking to that originally approved. introduces new impacts or increase the severity of known impacts; or No newimpacts or the severity of impacts is likely to result from the plan modifications.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original