Council archive · source document
09/1530 - MCU - Detached House [As Published] · 132009.1530
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
HERITAGE es.
141A Is any part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Hentage ‘Act 19927
wg J No-Gotot.18 {[_] Yes
1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
IX] No-Gotoa12 ([_] Yes
BS. part !, lable &, kos 2.
[REMOVING QUARRY MATERIAL; WILD RIVER AREA’ “
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
[X] No - Go to. 01.3 Ove Yes
2. fam 14 IP Reguiatior
Da reek Minera ceri ata a lb nd nr pet meth NS Antenne hte
ENVIRONMENTALLY. RELEVANT ACTIVITY; WILD RIVER j
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
yi <|No-Gotoa14 [_] Yes
mf, seneaicn 2 table 2 ken
Inarminta Modechart AckiG84, secnta
WITHIN TH iMITS O OFAPORT:
"ay feeivhe hash 15 .
14 ls sy part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
D<] No - Go to Q1.5
O Yes
iP Regulation. schedule 2 table 2. tems 15 ena i
‘DECLARED: FISH’ HABITAT AREA vee Rs
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries J Act 1994?
DX] No - Goto 01.6
oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
2. i3bie
pele
Bees
en sinc
‘COMMUNITY: INFRASTRUCTURE « \
SHO Yon ns asc ae nk a Omni
1.6 Is any part of the premises designated for community infrastructure?
IX] No - Goto. Q1.7
LI Yes
IP Regutatio
in, Schodule 2. tz
WASTE WATER MANAGEMENT.
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[1] No -Endof Section 1 [X} Yes
\f yes, is any part of the disposal system proposed to be located in an area declared to be a catchment area under the
Water Act 2000?
No -Endof Section? [] Yes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1530 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.