INTEGRATED PLANNING ACT 1997

 

IDAS Assessment Checklist, Version 22

 

      

EN yD

Answering the following questions will assist you in determining which sections of the checklist must be completed for
unsure, phone or visit your local government or log onto the DIP website www.dip.qld.go'

 

it

your application. If

 

checklist

For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this

 

Does the application seek approval to make a material change of use of the premises?

 

 

 

 

 

 

 

 

   

 

application is for e material change of use, and or operational work. Also, the application must be referred to the

iccal government as Advice Agency.

Part E if for building

 

 

 

if yes - complete Section 2 of this checktist bles {CINo
Does the application seek approval to reconfigure a lot?

if yes - complete Section 3 of this checklist and Part F af IDAS Application Form 1. If the premises are completely within a single |] Yes |(JNo
local government area assessment is by the local governinent.

Does the application seek approval to carry out operational work? =

if yas - complete Section 4 of this checklist CiYes |[XINo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Ces |5qNo
H yes - complete Section § of this checklist

Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?

i? yes - complete Section 6 of this checklist OYes |KINo
Does the application seek approval to carry out building work requiring assessment against a local government planning

scheme? DYes |XNo
if yes - complete Forin 1 Part E of IDAS Application Form 1. Assessment is by the focal government.

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?

if yes - go to Appendix 1 of this checklist for advice on builiding referrals. Complete Part B of IDAS Application Form 1. OYes |)No
Assessment is by a building certifier

Do you wish the application fo be assessed against a superseded planning scheme?

H yes - complete Fovn 7 Attachment 1 OYes |DNo
Is the application for development completely or partly on Caims and Mackay airport land under the Airport Assets

(Restructuring and Disposal) Act 2008?

if yes - Assessmant is by the Department structure and Planning. Complete Form 1 Part 0 of IDAS Appiication Form 1 ifthe |L1Yes |BXNo

 

 

 

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1530 - MCU - Detached House [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.