Skip to the record
For the highest quality transcripts.

Council archive · source document

09/1530 - MCU - Detached House [As Published] · 132009.1530

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Part D, Version 3.2

 

 

 

 

Confirmation of~*

lodgement

: Method of lodgement

 

 

 

 

 

 

) Plans showing the nature and location of the proposed use eon the premises anda statement about the
intensity and scale of the proposed use (e.g. number of employees, days and hours of operation, number of visitors,
number of seats, capacity of storage area)

X

Confirmed

 

 

When ‘the application involves reuse of existing’ buildings

 

 

(il) Plans showing the size and location of the buildings to be reused

Confirmed

 

|

  

 

When the application invol

 

Not applicable
: ct

 
   

tbh

 

(iti) Plans showing the size ‘and location of the proposed new building work

Confirmed

 

Not applicable

 

When the application involves.reuse of other existing works

 

 

 

(iv) Plans showing the nature and location of the works to be reused

Confirmed

 

 

Not applicable

 

Wher the: application’ \nvolves'r ‘nie

 

 

 

(v) Plans showing the nature and location of the proposed n new sw operational works

 

O} swIO) |X

Confirmed

 

 

 

 

 

 

 

 

 

 

 

 

[X] Not applicable
OFFICE USE ONLY
Date received Reference numbers
Advice for completing Part D
General advice
. Part A must also be completed for all IDAS development applications.
. The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to
another question.
. When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) for coastal development applications, use the

Electronic Funds Transfer (EFT) payment notification to this application.

process from the information sheet Electronically paying fees fo the Environmental Protection Agency (EPA) and securely attach the form

 

 

 

Q3 A development permit authorises development to occur. A preliminary approval is a step in the approval process and does not authorise
development to occur - a subsequent application for a development permit must be sought.
Table D Ifthe MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for the

operational work if approval for the operational work has not been applied for in this application or in a separate application.

 

1 This form is also used for material change of use assessable against the land use plan for Caims airport land or Mackay airport land. Wherever planning scheme is

Mentioned, take it to mean the land use plan for the airport land.

 

 

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1530 - MCU - Detached House [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.