Council archive · source document
Decision Notice - MCU23-0129 & OPW23-0153 · MCU23/0129
2311-37569 SRA 7. (a) Light/mark all vessels, structure, plant and equipment associated | For the duration of with the works, in accordance with Section 3 of AS4282-1997 works and for operation Control of the obtrusive effects of outdoor lighting. to be maintained at all Lighting provided must not obscure, disguise or otherwise interfere times with the safe navigation of other vessels, including the effectiveness of navigational lighting. 8. The construction, operation and maintenance of the pontoon. And For the duration of any ship berthed, moored or attached to the structure, must not: works, and at all times (a) encroach into, pass over or under a navigation corndor or (b) be located in a high risk maritime zone; or impede the safe navigation of other ships or boats; or restrict safe access to or from neighbouring structures 9. Remove and dispose of any debris or similar obstruction For the duration of encountered whilst undertaking the work at an appropriately licensed | works facility. 10. All piles and/or structure to be demolished, both above and below Prior to the completion the waterline must be completely extracted/removed. of the works State Assessment and Referral Agency Page 4 0f8 Document Set ID: 22666179 Version: 2, Version Date: 16/11/2023 Page 8 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - MCU23-0129 & OPW23-0153.pdfRelated documentApplication case desk ↗
About this file
- File size
- 682 KB (small file)
- File type
No other editions are linked here.