Original source · versioned page text
MCU14/0056 - Attachment K -Traffic Impact Assessment
Very large file: it may take a few minutes
The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
PEKOL TRAFFIC & TRANSPORT 5.0 5.1 5.2 CONCLUSIONS AND RECOMMENDATIONS Conclusions The proposed development has been evaluated in terms of its impact on the surrounding road network, site access operations and internal layout. The main points to note are: it is proposed to redevelop the site to provide a mixed-use development comprising a service _ station, fast-food restaurant, retail store, self-storage units and tourist park with a total building GEA of 3,563m? == _ two points of vehicular access are proposed, one from Myall Street and one from Ferrells Road == _ the proposed development incorporates 224 car parking spaces across the site, which is consistent with the Noosa Plan and is expected to adequately cater for the anticipated parking demand == adequate provision is made for the standing, parking, loading and unloading, access and manoeuvring of service vehicles and petrol tankers within the development site m= service vehicles would predominantly use the Myall Street access and any amenity impacts associated with increased heavy vehicle movements on Ferrells Road would be limited == _ the development is expected to generate a maximum of 369 vehicle trip ends during the weekday evening peak period, and 363 vehicle trip ends during the Saturday peak period == of the weekday evening peak hour traffic generation, 137 vehicle trips are predicted to be new trips on the network, with the remaining 232 trips being diverted == of the Saturday peak hour traffic generation, 160 vehicle trips are predicted to be new trips on the network, with the remaining 203 trips being diverted m= _ the site access intersection on Myall Street is expected to experience excellent operations during the opening year (2016) and future year (2026) m= __ the Myall Street / Ferrells Road intersection is expected to demonstrate ‘excellent’ operations in the 2016 and 2026 scenario == the Myall Street / Bruce Highway Ramps intersection is expected to demonstrate ‘excellent’ operations in the 2016 and 2026 scenario Recommendations Based on our analysis it is recommended that: a left turn auxiliary deceleration lane (AUL) and a channelised right turn treatment (CHR) be provided at the Myall Street / Site Access intersection pavement arrows be painted at the site access crossover and throughout the internal layout to emphasise the intended directions of vehicle flow P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.