Original source · versioned page text
MCU14/0056 - Attachment K -Traffic Impact Assessment
Very large file: it may take a few minutes
The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
PEKOL TRAFFIC & TRANSPORT The results indicate that both intersections currently experience “excellent” operations under existing weekday peak hour evening and Saturday peak hour conditions. Both intersections also currently operate well within DMTR’s acceptable limit during the weekday evening and Saturday peak hours. 3.0 PROPOSED DEVELOPMENT 3.1. Site Layout The proposed development incorporates a new mixed-use facility comprising retail, recreational and commercial land uses. The proposed development includes the following components: service station (244m? GFA) and car wash fast-food restaurant with drive-thru (292m? GFA) food retail store (920m? GFA) self-storage units (1,110m? GFA) tourist park (27 caravan parks and 10 cabins) The layout of the proposed development is attached in Appendix B and is shown in Figure 3.1. Figure 3.1: SITE LAYOUT Q P:\2012-13\13-082 MYALL STREET, COOROY\REPORTS\MYALL STREET, COOROY TIA.DOCX 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.