Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
i. safe access for pedestrians and cyclists clear of S7.4 The provision of bicycle lanes at intersections is generally in Not applicable
obstructions; accordance with AUSTROADS Part 14, section 5 and the Manual of
ii. an access area for vehicles onto properties; Urban Traffic Control Devices (MUTCD) Part 9.
iii. a corridor allocated for services and utilities; and
iv. additional amenity for minor roads.
O8 Stormwater drainage infrastructure is planned, designed S8.1 Stormwater drainage planning, design and construction is in Refer to Civil Engineering Report.
and constructed to— accordance with Section 4 of PSP5 Engineering Design Standards –
a) be accessible, cost effective and easily maintainable; Roads, Drainage and Earthworks;
b) protect downstream capacity; AND
c) protect downstream water quality;
S8.2 As Constructed data is submitted in accordance with Section 6 of Refer to Civil Engineering Report.
d) maximise on-site stormwater retention and retardation;
PSP5 Engineering Design Standards – Roads, Drainage and Earthworks;
and
AND
e) convey run-off to stormwater drainage in a manner that
allows roads to be trafficable in Q100 ARI local rainfall S8.3 Stormwater drainage planning, design and construction is in Refer to Civil Engineering Report.
events. accordance with the Queensland Urban Drainage Design Manual.
S9.1 Roads and stormwater drainage infrastructure is constructed in Refer to Civil Engineering Report.
O9 Roads and stormwater drainage infrastructure is accordance with—
constructed— a) Sections 2, 3 and 4 of PSP5 Engineering Design Standards – Roads,
a) in accordance with appropriate engineering standards; Drainage and Earthworks;
and b) Queensland Design Code for Residential Streets;
b) to minimise adverse environmental impacts, including c) AUSTROADS; or
from run-off and erosion. d) A combination of the principles in these documents;
AND
S9.2 Erosion and sediment control measures are designed and Refer to Civil Engineering Report.
implemented in accordance with the Institution of Engineers Australia
page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.