MCU14/0056 - Attachment K -Traffic Impact Assessment

of 95

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Transport, Roads and Drainage Code
Specific Outcomes                                            Acceptable Solutions/Probable Solutions                                 Compliance

i. safe access for pedestrians and cyclists clear of         S7.4 The provision of bicycle lanes at intersections is generally in    Not applicable
obstructions;                                                accordance with AUSTROADS Part 14, section 5 and the Manual of
ii. an access area for vehicles onto properties;             Urban Traffic Control Devices (MUTCD) Part 9.
iii. a corridor allocated for services and utilities; and
iv. additional amenity for minor roads.




O8 Stormwater drainage infrastructure is planned, designed   S8.1 Stormwater drainage planning, design and construction is in        Refer to Civil Engineering Report.
and constructed to—                                          accordance with Section 4 of PSP5 Engineering Design Standards –
a) be accessible, cost effective and easily maintainable;    Roads, Drainage and Earthworks;
b) protect downstream capacity;                              AND
c) protect downstream water quality;
                                                             S8.2 As Constructed data is submitted in accordance with Section 6 of   Refer to Civil Engineering Report.
d) maximise on-site stormwater retention and retardation;
                                                             PSP5 Engineering Design Standards – Roads, Drainage and Earthworks;
and
                                                             AND
e) convey run-off to stormwater drainage in a manner that
allows roads to be trafficable in Q100 ARI local rainfall    S8.3 Stormwater drainage planning, design and construction is in        Refer to Civil Engineering Report.
events.                                                      accordance with the Queensland Urban Drainage Design Manual.


                                                             S9.1 Roads and stormwater drainage infrastructure is constructed in     Refer to Civil Engineering Report.
O9 Roads and stormwater drainage infrastructure is           accordance with—
constructed—                                                 a) Sections 2, 3 and 4 of PSP5 Engineering Design Standards – Roads,
a) in accordance with appropriate engineering standards;     Drainage and Earthworks;
and                                                          b) Queensland Design Code for Residential Streets;
b) to minimise adverse environmental impacts, including      c) AUSTROADS; or
from run-off and erosion.                                    d) A combination of the principles in these documents;
                                                             AND
                                                             S9.2 Erosion and sediment control measures are designed and             Refer to Civil Engineering Report.
                                                             implemented in accordance with the Institution of Engineers Australia

                                                                                       page 7
Log in to download the original file

MCU14_0056 - Attachment K -Traffic Impact Assessment.pdf · 13.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.