The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Transport, Roads and Drainage Code
Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
(Queensland Division) Soil Erosion and Sediment Control - Guidelines for
Queensland Construction Sites.
Environmental Protection S10.1 Roads and stormwater drainage follow the edge of existing Refer to Civil Engineering Report.
O10 Roads and stormwater drainage infrastructure are disturbed areas,
located and aligned so as to— or alternatively, these works are co-located within a combined utility
corridor;
a) minimise disturbance to native vegetation and/or other AND
habitat areas;
b) protect and maintain wildlife corridor movements and the
safety of native fauna;
c) minimise changes to the hydrological regime, including
drainage patterns, run-off and water quality;
d) avoid crossing watercourses, drainage lines and wetlands,
but where such crossings are unavoidable, disturbed areas
are reinstated and revegetated on completion of works; and
e) minimise bulk earthworks.
S10.2 Roads avoid native vegetation and provide for fauna underpasses Refer to Civil Engineering Report.
and associated fencing where appropriate;
AND
S10.3 Road infrastructure within or adjacent to native habitat Refer to Civil Engineering Report.
incorporates fences which allow for protected wildlife movement and
controls unrestricted access of domestic cats and dogs;
AND
S10.4 Native vegetation is protected from clearing or construction Refer to Civil Engineering Report.
activities by—
a) clearly marking vegetation to be retained with flagging tap;
b) installing protective fencing around the dripline of vegetation; and
c) ensuring stock piling, storage and vehicle parking occur outside the
areas of vegetation to be retained;
AND
S10.5 Low impact construction techniques are used around areas of Refer to Civil Engineering Report.
vegetation to be retained to minimise interference with the vegetation.
page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.