Skip to the record
For the highest quality transcripts.

Original source · versioned page text

MCU14/0056 - Attachment K -Traffic Impact Assessment

of 95

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Transport, Roads and Drainage Code
Specific Outcomes                                                 Acceptable Solutions/Probable Solutions                                    Compliance

                                                                  Sections 3 and 4 of PSP5 Engineering Design Standards – Roads,
                                                                  Drainage and Earthworks.


14.149 Road and rail corridors


                                                                  S14.1 Noise sensitive uses including residential uses are separated by a   Refer to Acoustic Report.
O14 Noise sensitive uses including residential uses are not       minimum of—
subjected to high traffic noise levels from the major road        a) 40m from the property boundary of roads within the major road
network or rail corridors.                                        network; and
                                                                  b) 80m from the property boundary of rail corridors;

                                                                  OR
                                                                  S14.2 Development in the vicinity of road corridors meets the following
                                                                  external design criteria for roads in the major road network—
                                                                  a) 54dB(A)L          based on predicted traffic volumes ten years hence;
                                                                              10 (18hours)


                                                                  AND
                                                                  S14.3 Development in the vicinity of rail corridors meets the following
                                                                  external design level noise criteria—
                                                                  a) 65dB(a), assessed as the 24hour average equivalent continuous A-
                                                                  weighted sound pressure level; and
                                                                  b) 87dB(A), assessed as a single event maximum sound pressure level.
14.151 Alterations to services and utilities
O16 Any alterations or repairs to infrastructure as a result of   S16.1 Any alterations or repair to infrastructure as a result of the
the development are made at no cost to Council.                   development are completed at the developer’s expense.




                                                                                             page 10
Log in to download the original file

MCU14_0056 - Attachment K -Traffic Impact Assessment.pdf · 13.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.