MCU14/0056 - Attachment K -Traffic Impact Assessment

of 95

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Transport, Roads and Drainage Code
Specific Outcomes                                               Acceptable Solutions/Probable Solutions                                       Compliance

                                                                No solution provided                                                          Refer to Civil Engineering Report.
O11 Roads and stormwater drainage infrastructure is proven
to be suitable for its use prior to Council accepting the
dedicated asset.


                                                                S12.1 The location, design and construction of stormwater drainage            Refer to Civil Engineering Report.
O12 Alignment of stormwater drainage infrastructure is to       structures is in accordance with Sections 4 and 5 of PSP5, Engineering
allow for easy access for the ongoing maintenance by            Design Standards - Roads, Drainage and Earthworks;
Council.                                                        AND


                                                                S12.2 Where infrastructure is located on private land an easement is          Refer to Civil Engineering Report.
                                                                dedicated over the infrastructure in accordance with Section 4 of PSP 5,
                                                                Engineering Design Standards – Roads, Drainage and Earthworks.


14.148 Frontage works


                                                                S13.1 The following infrastructure components already exist at the            Refer to Civil Engineering Report.
O13 Development is provided with external roadworks along       frontage of the site or are provided at the developer’s expense—
the full extent of the frontage of the site to an appropriate   a) full width sealed road;
standard having regard to the specified function of the road.   b) concrete kerb and channel where appropriate;
                                                                c) forming and grading to footpaths;
                                                                d) vehicular kerb and footpath crossings;
                                                                e) a constructed bikeway;
                                                                f) a constructed footpath;
                                                                g) a constructed carriageway;
                                                                h) required alterations to public utility mains, services or installations;
                                                                i) construction of any required alterations to public utility mains,
                                                                services or installations;
                                                                j) stormwater drainage works; and
                                                                k) installation of electrical conduits;

                                                                AND


                                                                S13.2 Road and drainage design and construction is in accordance with

                                                                                           page 9
Log in to download the original file

MCU14_0056 - Attachment K -Traffic Impact Assessment.pdf · 13.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.