Appendix D - Previous Approval Dec Not
Attached to the e-mail MCU14/0083 Development Application Cover letter, Forms, Report.
Officer: Glen Conforti
Direct Telephone: 07 5329 6241
Fax: 07 5329 6501
Our Reference: REC12/0014.01
Your Reference: 102995-10
17 March 2014
Bunnings Properties Pty Ltd
C/- RPS Australia East Pty Ltd
PO Box 1559
FORTITUDE VALLEY QLD 4006
Dear Sir/Madam
Compiled Decision Notice
Sustainable Planning Act 2009
I refer to your request to extend the relevant period of an existing approval. On
17 March 2014, Council decided your requested changes.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: REC12/0014.01
Street Address: 178 Eumundi Noosa Rd NOOSAVILLE QLD 4566
Real Property Description: Lot 101 SP 241371
Planning Scheme: The Noosa Plan (16 September 2013)
2 DECISION DETAILS
Council on decided to issue the following type of approval:
Development Permit to Reconfigure a Lot (1 Lot in 2 Lots & Park)
In relation to the request to make a change to the existing approval, Council decided to:
A. Approve a change to Item 3 extending the relevant period for 2 years to
15 March 2016.
B. Amend Advisory Note 4
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this development finishes on 15 March 2016.
4 CONSOLIDATED ASSESSMENT MANAGER CONDITIONS
When Conditions must be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision Notice
must be completed prior to submission of the subdivision plan to Council for
compliance assessment.
Page 1 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 5 pages
Page 2
REC12/0014.01
Approved Plans
2. Development authorised by this approval must be undertaken generally in accordance
with the Approved Plans and may amended by the conditions within this decision
notice.
3. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
ENGINEERING
Access
4. Access to Lot 102 must be undertaken in accordance with the conditions and plans
attached to the mediation agreement between Bunnings Properties Pty Ltd and
Sunshine Coast Regional Council dated 12 October 2010.
New Boundaries
5. The new boundaries for Lots 101, 102 and 300 must be generally in accordance with
the approved plan and
(a) Offset from the new kerb and channel by the distances indicated on the plans
attached to the mediation agreement between Bunnings Properties Pty Ltd and
Sunshine Coast Regional Council dated 12 October 2010,
(b) Include a truncation (6m x 6m three chord) at the intersection at the northern
corner of Lot 102,
(c) Be located such that all retaining walls, safety rails and fencing are located
wholly within the lots.
Electricity and Telecommunication Services
6. A connection to reticulated electricity and telecommunication services must be
provided to lots 101 and 102 in accordance with the standards and requirements of the
relevant service provider.
7. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
8. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Earthworks
9. Certification of the earthworks undertaken on the lots provided by a RPEQ must be
submitted to Council prior to the sealing of the survey plan. The certification must
include:
(a) Certification that the works have been undertaken in accordance with the
provisions of AS 3798 ‘Guidelines on Earthworks for Commercial and
Residential Development’
(b) Test results as required by AS 3798,
(c) Certification of the quality and uniformity of the materials.
Damage to Services and Assets
10. Any damage caused to existing services and assets above or below the ground must
be repaired:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the
development.
Page 2 of 6
Page 3
REC12/0014.01
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
LANDSCAPE & ECOLOGY
Drainage
11. Provide adequate drainage to ensure no ponding of water or excessive overland water
flows are directed onto public access pathways.
Landscaping
12. All entry statements and landscaping batters must be located entirely within private
land and not within the public road reserve.
Vegetation
13. The northern portion of proposed lot 101 (approximately 400m2) must be rehabilitated
in accordance with the following requirements. These rehabilitation works must be
completed prior to the sealing of the plans:
(a) removal of all weeds species listed in the following standards and legislation:
(i) declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
(ii) Maroochy Pest Management Plan 2006-2010 pest species of
significance in Group 1, Group 2 and Group 6.
(b) Stabilisation of all exposed soils with local native species suitable for the local
soil conditions.
(c) Removal of spoil material and other foreign materials.
(d) Certification of weed removal by a suitably qualified person must be provided to
Council prior to the sealing of the plan of survey.
UNITYWATER
14. Reticulated water must be provided to each lot in the development. This must include:
(a) Ensuring that existing internal water pipes are wholly contained within the lot
they will serve
(b) An approved water meter for Lot 102 in accordance with Unitywater Standard
Drawings SCW 350,355 and 360.
(c) An approved 150mm diameter water service connection to Lot 102 in
accordance with Unitywater requirements.
(d) Water meters located on alternative boundaries to electrical pillars.
15. Reticulated sewerage must be provided to each lot in the development. This must
include:
(a) Ensuring existing sewer house drains are wholly contained within the Lot they
will serve.
(b) Extension of the existing sewer in Gateway Drive to the property boundary of
Lot 102, and provision of a sewer connection within Lot 102.
16. A 3.0 metre wide easement must be provided over all Unitywater sewers located in
private property. A 4.0 metre wide easement must be provided over Unitywater sewers
greater than 3.0 metres deep. Easements must be located centrally over the main.
17. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
plants within these clearances must be low growing when mature and suitable
Unitywater approved varieties.
Page 3 of 6
Page 4
REC12/0014.01
18. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
5 REFERRAL AGENCY CONDITIONS
Not Applicable
6 APPROVED PLANS
The following plans are Approved Plans for the development:
Approved Plans
Plan No. Rev. Plan Name Date
102995-22 B Proposed Subdivision over Lot 80 on SP211687, 24 January 2012
prepared by RPS Group
7 REFERENCED DOCUMENTS
Not Applicable
8 ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
PLANNING
Nature and Extent of Approved Development
1. The applicant is advised that this development approval comprises Reconfiguring a Lot
for 1 Lot into 2 Lots and Lot 300 as a Park Lot.
Unitywater
2. Connection to the Unitywater live water supply and live sewerage system must be
undertaken by Unitywater at the applicants cost.
3. Should the applicant undertake the sewerage works, an Operational Works application
is required to be submitted to Council, or alternatively, Unitywater can undertake the
works at the applicant’s cost without the requirement for an Operational Works
application to Council.
Infrastructure Charges
4. The “Adopted Infrastructure Charge Notice” triggered by the original Development
Permit and issued in accordance with Council’s “Adopted Infrastructure Charges
Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the
Sustainable Planning Act 2009, remains applicable to this development.
Aboriginal Cultural Heritage Act 2003
5. There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable measures
to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to
fail to comply with the duty of care. Substantial monetary penalties may apply to
individuals or corporations breaching this duty of care. Injunctions may also be issued
by the Land and Resources Tribunal, and the Minister administering the Act can also
Page 4 of 6
Page 5
REC12/0014.01
issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to
discuss any obligations under the ACH Act.
9 PROPERTY NOTES
Not Applicable
10 PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME
Not Applicable
11 FURTHER DEVELOPMENT PERMITS REQUIRED
Development Permit for Operational Work (Sewerage Works)
12 SELF ASSESSABLE CODES
Not Applicable
13 SUBMISSIONS
Not Applicable
14 REASONS / GROUNDS FOR APPOVAL
Not Applicable
15 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
the Sustainable Planning Act 2009 is attached.
16 OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies of which are
available on line at www.noosa.qld.gov.au, or at Council offices.
DECISION NOTICE HISTORY
REC14/0014 - Original Decision Notice. 16 March 2012
REC14/0014 – Compiled Decision Notice 17 March 2014
Yours faithfully
GLEN CONFORTI
PLANNING TECHNICAL OFFICER
Encl. Appeal Rights
cc Unitywater
Page 5 of 6
Page 6
REC12/0014.01
Appeal Rights
SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING
REGULATION 2009
The following is an extract from the Sustainable
Planning Act 2009 (Chapter 7)
466 Appeals about decisions relating to
permissible changes
(1) For a development approval given for a
development application, the following persons
may appeal to the court against a decision on a
request to make a permissible change to the
approval—
(a) if the responsible entity for making the
change is the assessment manager for
the application—
(i) the person who made the
request; or
(ii) an entity that gave a notice
under section 373 or a pre-
request response notice about
the request;
(b) if the responsible entity for making the
change is a concurrence agency for the
application—the person who made the
request.
(2) The appeal must be started within 20 business
days after the day the person is given notice of
the decision on the request under section 376.
(3) Also, a person who has made a request under
section 369 may appeal to the court against a
deemed refusal of the request.
(4) An appeal under subsection (3) may be started at
any time after the last day the decision on the
matter should have been made.
Page 6 of 6