Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Stamped - Plans

Attached to the e-mail Change to Approval - 131999.982775.1 (17119 DA).

of 4

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
20165295 22 September 2016


[OCR of page images]
-

DRIVEWAY

GRADE EDGE
TO AVOID TRIP

FEMALE

MALE

 

 

 

 

 

 

 

 

 

EXTRACTOR wT1
b2
SKI
EXTRACTOR EXTRACTOR
PAI bz“
TR ~ .
we .
re, \
W/E

 

 

 

 

 

 

 

 

 

 

S2

 

1700

00

EXISTING WINDOW

EXTRACTOR

 
 
 
   
   
   
 
 
 
 
 
     
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EXTRACTOR wr2
~*~
°o
Oo
wo
_| ~
MIR
PAI | °
oO
oa
D2
8s
TR TCT J van a
- 7 —‘*
We Oo NY
8
SK1 Ms
W 1 PAINTED DOORS
HIDING WASTE
PA1 wi
sD
D2 L |

 

 

 

TAP

BASIN

VANITY
hi JOINERY

 

 

 

 

JNY
SK1

 

SEMI RECESSED BASIN

PAINTED JOINERY
HIDING WASTE

RECEPTION

EXTRACTOR

TAP
BASIN
VANITY
JOINERY

"VENT

NEW CEILING LIGHTS
L1 AND L2 TO BE LED

WARM LIGHT

EXISTING WINDOW

sD

 

 

d2

 

 

PA1

 

 

 

 

 

 

 

 

 

 

SK1

 

S2

900

 

SK1

PAINTED DOROS
HIDING WASTE

TAP
BASIN
VANITY
JOINERY

PA1

 

 

D1

 

 

 

 

SK1

 

 

 

 

 

PA2

D1

 

 

PA1

D2

 

SK1

 

 

E1

  
 
   
   

COPYRIGHT
All Rights Reserved

Use figured dimensions in preference to
scaling off drawings.

Check dimensions ond levels before
fabrication or setout.

Final coordination is the responsbility
of the controctor

The contractor shall ensure that all work
complies with relevant building codes. Any
queries or doubte In this regard must be
forwarded to the Architect before work

ISSUE NOTES
A FIRST ISSUE 27/8/16.

 

 

BUILDING SURVEYING PROFESSIONALS QLD P/L
BUILDING WORKS APPROVAL

20165295 22 September 2016

SUSTAINABLE PLANNING ACT 2009
STEWART MAGILL A81159

 

 

REFER TO SCHEDULE

OF FINISHES FOR
SPECIFICATIONS

 

P.O. BOX 1032 NOOSA 4567
Telephone 0428 983 293
EMAIL [email protected]

PROJECT

2 HASTINGS ST

CUENT

THE BODY CORP

DRAWING TITLE

COMMERCIAL
TOILETS

1:50 AS 362

PHASE OWG No ISSUE

DD W3 A
Log in to download the original file

Stamped - Plans.pdf · 606 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.