Original source · versioned page text
Stamped - Plans
Attached to the e-mail Change to Approval - 131999.982775.1 (17119 DA).
Plans and drawings: the text below has words only, no drawings.
20165295 22 September 2016
[OCR of page images]
-
DRIVEWAY
GRADE EDGE
TO AVOID TRIP
FEMALE
MALE
EXTRACTOR wT1
b2
SKI
EXTRACTOR EXTRACTOR
PAI bz“
TR ~ .
we .
re, \
W/E
S2
1700
00
EXISTING WINDOW
EXTRACTOR
EXTRACTOR wr2
~*~
°o
Oo
wo
_| ~
MIR
PAI | °
oO
oa
D2
8s
TR TCT J van a
- 7 —‘*
We Oo NY
8
SK1 Ms
W 1 PAINTED DOORS
HIDING WASTE
PA1 wi
sD
D2 L |
TAP
BASIN
VANITY
hi JOINERY
JNY
SK1
SEMI RECESSED BASIN
PAINTED JOINERY
HIDING WASTE
RECEPTION
EXTRACTOR
TAP
BASIN
VANITY
JOINERY
"VENT
NEW CEILING LIGHTS
L1 AND L2 TO BE LED
WARM LIGHT
EXISTING WINDOW
sD
d2
PA1
SK1
S2
900
SK1
PAINTED DOROS
HIDING WASTE
TAP
BASIN
VANITY
JOINERY
PA1
D1
SK1
PA2
D1
PA1
D2
SK1
E1
COPYRIGHT
All Rights Reserved
Use figured dimensions in preference to
scaling off drawings.
Check dimensions ond levels before
fabrication or setout.
Final coordination is the responsbility
of the controctor
The contractor shall ensure that all work
complies with relevant building codes. Any
queries or doubte In this regard must be
forwarded to the Architect before work
ISSUE NOTES
A FIRST ISSUE 27/8/16.
BUILDING SURVEYING PROFESSIONALS QLD P/L
BUILDING WORKS APPROVAL
20165295 22 September 2016
SUSTAINABLE PLANNING ACT 2009
STEWART MAGILL A81159
REFER TO SCHEDULE
OF FINISHES FOR
SPECIFICATIONS
P.O. BOX 1032 NOOSA 4567
Telephone 0428 983 293
EMAIL [email protected]
PROJECT
2 HASTINGS ST
CUENT
THE BODY CORP
DRAWING TITLE
COMMERCIAL
TOILETS
1:50 AS 362
PHASE OWG No ISSUE
DD W3 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original