Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Attach G- Engineering Report

Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.

of 145

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 125, section 1. The text section number identifies this passage in the reader.

                                    3 Garnet Street Cooroy, QLD 4563
                                                           Earthworks Code



Earthworks Code
Specific Outcomes                              Acceptable Solutions/Probable Solutions              Compliance
Environmental protection                       No solution provided.                                The proposed development works
O10 Earthworks minimise any adverse impact                                                          will comply with this requirement.
upon groundwater, watercourses, drainage
lines, wetlands, and native vegetation.


Dams                                           S11.1 Where the site is in the Rural Zone—           Not applicable
O11 Dam location and construction does not     a) the land has a slope of less than 25% (1:4);
impact upon neighbouring properties in terms   and
of—                                            b) the earthworks including cut and fill batters
a) hydrology;                                  and retaining walls are setback a minimum of
b) alteration of existing overland flowpaths   50m from the property boundary; and
and patterns;                                  c) the size of the lot is greater than 5 Hectares;
c) landslide or failure of dam wall; and       AND .
d) effluent disposal areas.
                                               S11.2 Where the site is in the Rural Settlement      Not applicable
                                               Zone or the Rural Zone where the lot is less than
                                               5 Hectares—
                                               a) the land has a slope of less than 1:6; and
                                               b) the earthworks including cut and fill batters
                                               and retaining walls are setback a minimum of
                                               20m from the property boundary; and
                                               c) involving less than 500m3 of material; AND
                                               S11.3 For all other zones—                           Not applicable
                                               No solution provided
Log in to download the original file

Attach G- Engineering Report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.