Attach G- Engineering Report

Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.

of 145

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

                                                                                                              ENG
                                                  Engineering Report & Stormwater Management Plan
                                          Date:          5/02/2016      Document No.:     15087-ENG-01.Docx

                                           By:              MRS          Revision No.:              A


                     f. Maintenance

    Construction Phase Management Plan
Potential construction phase impacts include the following:
 Sedimentation and erosion
 Management of contaminated soils and materials on the site Construction Material (such
    as cement)

     General
The objective of the Construction Phase Management Plan is to comply with the requirements
of the Queensland Environmental Protection Act 1994 and Environmental Protection (Water)
Policy 2009 so that the environmental values of effected receiving waters are maintained or
enhanced. In essence the purpose of the Plan is to prevent polluted stormwater being
discharged to the local waterways.

    Performance Indicators
The management is not being effective when any of the following occur during the
construction phase of the project.
 The required water quality objectives are not achieved,
 Contaminated water is released off site.

      Construction Phase Management of Sedimentation and Erosion
A sediment and siltation fence will be erected around the property boundary to ensure that
sediment is not washed off site and onto adjacent properties or roads. Entry and exit from
the site will be restricted to a single stabilised location to minimise the rise of onsite transport
of silt sediment or mud. It is anticipated that a layer of crushed rock will provide the
necessary stabilisation of the access route. If required a specific bunded wash down area will
be provided for the cleaning of plant before leaving the site and all wash down waste water
will be collected. In the event that debris or sediment leaves the site it will be cleaned.

    Management of Contaminated Soils Materials
There are no contaminated soils materials fill on the site. The site is not listed on the public
contaminated site’s register.

     Management of Imported Materials
Any material imported to the site including construction materials will be stockpiled in a
location where it cannot contaminate the stormwater system or stormwater runoff.

     Complaint Response
The contractor will erect signage at the entrance to the works with contact information,
including afterhours contact numbers. The contractor will properly deal with all complaints.




A PO Box 26, Carina Q 4152                                                                   12 | P a g e
E [email protected]
W www.vtce.com.au
Log in to download the original file

Attach G- Engineering Report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.