Attach G- Engineering Report
Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.
Original PDF page 134, section 1. The text section number identifies this passage in the reader.
3 Garnet Street Cooroy, QLD 4563
Transport, Roads and Drainage Code
Transport, Roads and Drainage Code
Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
ii. provide for the safe passage of vehicles, b) wide kerbside lane;
pedestrians, cyclists, and discharge of c) exclusive or peak period bicycle lane;
stormwater run-off from contributing d) advisory treatments such as Bicycle Awareness
catchments and the preservation of all Zone;
weather access; e) shared parking / bicycle lane;
c) kerb and channel— f) contra flow bicycle lane; and
i. controls vehicle movement by delineating g) bus/bicycle lane.
the carriageway for all users;
ii. conveys road pavement run-off to
stormwater drainage in a manner that
S7.4 The provision of bicycle lanes at intersections is Not applicable for this
allows the road to be trafficable in Q100
generally in accordance with AUSTROADS Part 14, development.
ARI local rainfall events; and
section 5 and the Manual of Urban Traffic Control
d) verges and footpaths provide—
Devices (MUTCD) Part 9.
i. safe access for pedestrians and cyclists
clear of obstructions;
ii. an access area for vehicles onto
properties;
iii. a corridor allocated for services and
utilities; and
iv. additional amenity for minor roads.
O8 Stormwater drainage infrastructure is S8.1 Stormwater drainage planning, design and The proposed development
planned, designed and constructed to— construction is in accordance with Section 4 of PSP5 works will comply with this
a) be accessible, cost effective and easily Engineering Design Standards – Roads, Drainage and requirement as shown on the
maintainable; Earthworks; preliminary civil engineering
b) protect downstream capacity; AND design drawings.
c) protect downstream water quality;
S8.2 As Constructed data is submitted in accordance The proposed development
d) maximise on-site stormwater retention
with Section 6 of PSP5 Engineering Design Standards works will comply with this
and retardation; and
– Roads, Drainage and Earthworks; requirement.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.