                                       3 Garnet Street Cooroy, QLD 4563
                                                        Transport, Roads and Drainage Code


Transport, Roads and Drainage Code
Specific Outcomes                               Acceptable Solutions/Probable Solutions                   Compliance
ii. provide for the safe passage of vehicles,   b) wide kerbside lane;
pedestrians, cyclists, and discharge of         c) exclusive or peak period bicycle lane;
stormwater run-off from contributing            d) advisory treatments such as Bicycle Awareness
catchments and the preservation of all          Zone;
weather access;                                 e) shared parking / bicycle lane;
c) kerb and channel—                            f) contra flow bicycle lane; and
i. controls vehicle movement by delineating     g) bus/bicycle lane.
the carriageway for all users;
ii. conveys road pavement run-off to
stormwater drainage in a manner that
                                                S7.4 The provision of bicycle lanes at intersections is   Not applicable for this
allows the road to be trafficable in Q100
                                                generally in accordance with AUSTROADS Part 14,           development.
ARI local rainfall events; and
                                                section 5 and the Manual of Urban Traffic Control
d) verges and footpaths provide—
                                                Devices (MUTCD) Part 9.
i. safe access for pedestrians and cyclists
clear of obstructions;
ii. an access area for vehicles onto
properties;
iii. a corridor allocated for services and
utilities; and
iv. additional amenity for minor roads.


O8 Stormwater drainage infrastructure is        S8.1 Stormwater drainage planning, design and             The proposed development
planned, designed and constructed to—           construction is in accordance with Section 4 of PSP5      works will comply with this
a) be accessible, cost effective and easily     Engineering Design Standards – Roads, Drainage and        requirement as shown on the
maintainable;                                   Earthworks;                                               preliminary civil engineering
b) protect downstream capacity;                 AND                                                       design drawings.
c) protect downstream water quality;
                                                S8.2 As Constructed data is submitted in accordance       The proposed development
d) maximise on-site stormwater retention
                                                with Section 6 of PSP5 Engineering Design Standards       works will comply with this
and retardation; and
                                                – Roads, Drainage and Earthworks;                         requirement.
Log in to download the original file

Attach G- Engineering Report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.