Attach G- Engineering Report
Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.
Original PDF page 135, section 1. The text section number identifies this passage in the reader.
3 Garnet Street Cooroy, QLD 4563
Transport, Roads and Drainage Code
Transport, Roads and Drainage Code
Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
e) convey run-off to stormwater drainage in AND
a manner that allows roads to be trafficable
S8.3 Stormwater drainage planning, design and The proposed development
in Q100 ARI local rainfall events.
construction is in accordance with the Queensland works will comply with this
Urban Drainage Design Manual. requirement as shown on the
preliminary civil engineering
design drawings.
S9.1 Roads and stormwater drainage infrastructure The proposed development
O9 Roads and stormwater drainage is constructed in accordance with— works will comply with this
infrastructure is constructed— a) Sections 2, 3 and 4 of PSP5 Engineering Design requirement as shown on the
a) in accordance with appropriate Standards – Roads, Drainage and Earthworks; preliminary civil engineering
engineering standards; and b) Queensland Design Code for Residential Streets; design drawings.
b) to minimise adverse environmental c) AUSTROADS; or
impacts, including from run-off and d) A combination of the principles in these
erosion. documents;
AND
S9.2 Erosion and sediment control measures are The proposed development
designed and implemented in accordance with the works will comply with this
Institution of Engineers Australia (Queensland requirement and will incorporate
Division) Soil Erosion and Sediment Control - erosion and sediment control
Guidelines for Queensland Construction Sites. measures as shown on the
preliminary civil engineering
design drawings.
Environmental Protection S10.1 Roads and stormwater drainage follow the The proposed development
O10 Roads and stormwater drainage edge of existing disturbed areas, works will comply with this
infrastructure are located and aligned so as or alternatively, these works are co-located within a requirement as shown on the
to— combined utility corridor; preliminary civil engineering
AND design drawings.
a) minimise disturbance to native
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.