Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Attach G- Engineering Report

Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.

of 145

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 139, section 1. The text section number identifies this passage in the reader.

                                        3 Garnet Street Cooroy, QLD 4563
                                                       Transport, Roads and Drainage Code


Transport, Roads and Drainage Code
Specific Outcomes                              Acceptable Solutions/Probable Solutions                  Compliance
network or rail corridors.                     b) 80m from the property boundary of rail corridors;

                                               OR
                                               S14.2 Development in the vicinity of road corridors
                                               meets the following external design criteria for
                                               roads in the major road network—
                                               a) 54dB(A)L10 (18hours) based on predicted traffic
                                               volumes ten years hence;

                                               AND
                                               S14.3 Development in the vicinity of rail corridors
                                               meets the following external design level noise
                                               criteria—
                                               a) 65dB(a), assessed as the 24hour average
                                               equivalent continuous A-weighted sound pressure
                                               level; and
                                               b) 87dB(A), assessed as a single event maximum
                                               sound pressure level.
14.151 Alterations to services and utilities
O16 Any alterations or repairs to              S16.1 Any alterations or repair to infrastructure as a
infrastructure as a result of the              result of the development are completed at the
development are made at no cost to             developer’s expense.
Council.
Log in to download the original file

Attach G- Engineering Report.pdf · 8.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.