Original source · versioned page text
Attach G- Engineering Report
Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.
Original PDF page 140, section 1. The text section number identifies this passage in the reader.
3 Garnet Street Cooroy, QLD 4563
Water Supply & Sewerage Reticulation Code
Water Supply & Sewerage Reticulation Code
Water Supply & Sewerage Reticulation Code
Specific Outcomes Acceptable Solutions/Probable Solutions Compliance
Table 14-62 Water supply
14.164 Design and construction (water)
O1 Water supply infrastructure— S1.1 Water supply infrastructure is designed in The proposed development
a) meets the needs of the users; accordance with PSP6 – Engineering Design works will comply with this
b) is designed to be compatible with Standards — Water and Sewerage and As requirement, with the proposed
existing infrastructure; and Constructed data submitted in accordance with internal water supply being
c) is designed using materials that are PSP6 – Engineering Design Standards — Water and constructed in accordance with
suitable for the use, durable, easy to Sewerage. AS3500.
maintain and cost effective, taking into Water reticulation will be
account the whole of life cycle cost and designed and constructed in
Council’s maintenance inventory. accordance with SEQ D & C Code
and PSP6 Engineering Design
Standards – Water and Sewerage.
O2 Water supply infrastructure is S2.1 Water supply infrastructure is constructed in The proposed development
constructed— accordance with PSP6 – Engineering Design works will comply with this
a) in accordance with appropriate Standards — Water and Sewerage; AND requirement.
engineering standards; and
S2.2 Erosion and sediment control measures are The proposed development will
b) to minimise adverse environmental
designed and implemented in accordance with the incorporate erosion and sediment
impacts.
Institution of Engineers Australia (Queensland control measures as shown on
Division) Soil Erosion and Sediment Control - the preliminary civil engineering
Guidelines for Queensland Construction Sites. design drawings.
O3 Water supply infrastructure is proven to No solution provided. The proposed development
be suitable for its use prior to Council works will comply with this
accepting the dedicated asset. requirement, with the proposed
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.