Figure 0.2 – DRAINS Pre-development catchments
Figure 0.3 – DRAINS Post-development catchments
The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 0.1 Existing and proposed site peak discharge rates.
Table 0.1 Existing and proposed site peak discharge rates (unmitigated)
A.E.P Qy Pre (m3/s) Qy Post (m3/s) Qchange (m3/s) Qchange (%)
63.2% AEP 0.013 0.013 0.000 0%
50% AEP 0.019 0.019 0.000 0%
20% AEP 0.023 0.023 0.000 0%
10% AEP 0.030 0.030 0.000 0%
5% AEP 0.034 0.034 0.000 0%
2% AEP 0.039 0.039 0.000 0%
1% AEP 0.042 0.043 0.001 2%
Project number 20220051 Page 11 of 16
File RECOR Stormwater Management Report - 20220051.docx, 2022-05-05 Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.