Original source · versioned page text
Civil Package
Original PDF page 24, section 1. The text section number identifies this passage in the reader.
Based on the modelling, the minor increase to impervious area from the proposed development will only result in an increase of 1L/s for the 1% storm AEP event, being a change of only 2% The pre-post comparison found that under all other storm events up to the 1% AEP analysed not resulting in an increase of the peak flows. As such, the proposed development is considered to not impact the downstream receiving environment in a manner that will alter the catchment hydrology or result in nuisance run-off that may impact downstream properties. As peak outflows from the development are typically as per existing conditions, no stormwater attenuation is required to control outflows from the proposed development. Project number 20220051 Page 12 of 16 File RECOR Stormwater Management Report - 20220051.docx, 2022-05-05 Revision 0 P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.